• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:52来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

__________
 Subtask 28-22-00-941-052
 A. Safety Precautions
 (1)
 Obey the fuel safety procedures (Ref. TASK 28-00-00-910-001).

 (2)
 It is not permitted to pressurize the APU fuel-line shroud with a fluid. Use air or nitrogen to pressurize the shroud for the leak test.


 1EFF : ALL 1 28-22-00Page 511 1 1 Feb 01/98 1 1 1CES 1


 (3) Put the warning notices in position: - on the refuel/defuel control panel 800VU, to tell persons not to refuel the aircraft, - on the FUEL section of the overhead panel 40VU, to tell persons not to operate the fuel system,
 - on the APU section of the overhead panel 25VU, to tell persons not to operate the APU.
 Subtask 28-22-00-860-050
 B. Aircraft Maintenance Configuration
 (1)
 Open the RH main gear door (Ref. TASK 32-12-00-010-001).

 (2)
 Make sure that the APU fuel line is filled with fuel (Ref. TASK 28-22-00-710-001).


 Subtask 28-22-00-480-051
 C. Installation of the Test Equipment
 (Ref. Fig. 501/TASK 28-22-00-991-001)

 WARNING : DO NOT GET AIRCRAFT FUEL:
_______
 -
IN YOUR MOUTH

 -
IN YOUR EYES


 -ON YOUR SKIN FOR A LONG TIME. AIRCRAFT FUEL IS POISONOUS.
 WARNING : DO NOT GET YOUR CLOTHES SOAKED WITH FUEL.
_______
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Remove the bolt (5) and the washer (4). NOTE : If you find signs of leak-fuel when you disconnect the drain

____ line (2), repair/replace the APU fuel-line components as necessary.

 (3)
 Loosen the the nut (7) and disconnect the drain line (2) from the union (6).


 NOTE : Hold the union (6) with a second wrench.
____
 (4) Put a blanking cap on the union (6).
 1EFF : ALL 1 28-22-00Page 512 1 1 Feb 01/98 1 1 1CES 1


 APU Fuel-Line Shroud - Drain Line Connection
 Figure 501/TASK 28-22-00-991-001
 1EFF :  ALL  1  28-22-00 Page 513 
1  1  Feb 01/98
 1  1
 1CES  1

 

 (5) Make sure that the ground air-pressure generator, the valves, the pressure hoses and pressure gages are in correct condition and assemble the items to the correct test configuration.
 NOTE : Make sure that the ground air-pressure generator can supply
____ compressed air which is dried, filtered and pressure regulated to 20 psi (1.3789 bar). Make sure that the pressure gages are approved and calibrated for a pressure up to 30 psi (2.0684 bar).
 (6) Connect the test equipment to the drain line (2).
 4. Procedure
_________
 Subtask 28-22-00-790-050
 A. Leak Test of the APU Fuel-Line Shroud
 (Ref. Fig. 501/TASK 28-22-00-991-001)

 (1) Do this test:
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1.
 Make sure that the shut-off  - on the pressure gages 1 and 2 you can valves B and C are closed and monitor that the air pressure in the open the shut-off valve A. APU fuel-line shroud increases to 20 Start the ground air-pressure psi (1.3789 bar). generator and slowly increase the pressure to 20 psi (1.3789 bar).

 2.
 Close the shut-off valve A and  - on the pressure gage 2 you can read stop the ground air-pressure that the air pressure in the APU generator. fuel-line shroud remains at 20 psi

 (1.3789 bar).

 3.
 Monitor the pressure gage 2 and  - on the pressure gage 2 you can read make sure that the air pressure that the air pressure in the APU in the APU fuel-line shroud fuel-line shroud is 20 psi (1.3789 remains at 20 psi (1.3789 bar) bar) and does not decrease. for 15 minutes.


 NOTE : Leaks are not permitted.
____ If the pressure decreases during the 15 minutes, do a leak check with the soap solution. When you find the leak(s), do the repair/replace as necessary.
 1EFF : ALL 1 28-22-00Page 514 1 1 Feb 01/98 1 1 1CES 1


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------After the repair/replacement you must do the complete test again.
 4. After 15 minutes, open the  - on the pressure gage 2 you can read
 shut-off valve C and release the  that the air pressure in the APU
 air pressure from the APU  fuel-line shroud decreases
 fuel-line shroud to the ambient  completely.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油3(112)