 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU FUEL/L WING TK/PUMP2 SPLY 7QA N26 121VU FUEL/L WING TK/PUMP1 SPLY 1QA N23 121VU FUEL/CTR TK/PUMP2 SPLY 30QA P26 121VU FUEL/CTR TK/PUMP1 SPLY 29QA P23 121VU FUEL/R WING TK/PUMP2 SPLY 8QA Q26 121VU FUEL/R WING TK/PUMP1 SPLY 2QA Q23 123VU L WING TK/PUMP 1/STBY SPLY 11QA AD12 123VU R WING TK/PUMP 1/STBY SPLY 12QA AE12
 Subtask 28-21-43-010-052
 D. Get Access
 (1)
 Put the access platform below the applicable access panel 540RB(640RB).

 (2)
 Remove the wing access panel (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):

 -
FOR 37QM
 remove 540RB


 -
FOR 38QM
 remove 640RB

 

 

 4. Procedure_________
 (Ref. Fig. 403/TASK 28-21-43-991-003)
 Subtask 28-21-43-020-052
 A. Removal of the Fuel-Pump Check Valve 37QM(38QM)
 (1)
 Disconnect the pipe (1) at the check-valve (2).

 (2)
 Remove the check-valve (2) from the pipe assembly (4).

 (3)
 Put blanking plugs on the disconnected line ends.

 (4)
 Remove and discard the O-ring (3).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-43Page 425 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Fuel-Pump Check-Valve 37QM(38QM)
 Figure 403/TASK 28-21-43-991-003

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-43Page 426 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-21-43-400-003


 Installation of the Fuel-Pump Check-Valve 37QM(38QM)
 WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______ NOTICES ARE IN POSITION.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific safety barriers
 No specific access platform 2.8 m (9 ft. 2 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) Material No. 04-012 USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 Material No. 19-003  USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-43Page 427 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
3  O-ring  28-21-05 36 -050
 3  O-ring  28-21-05 36A-050
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-25-00-650-001 Pressure Defuel 28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the
 Center Tank 28-25-00-869-001 Fuel Transfer 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
 28-21-43-991-003  Fig. 403
 3. Job Set-up
__________
 Subtask 28-21-43-941-058
 A. Safety Precautions
 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Make sure that the safety barriers are in position.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油3(37)