 (i)  
Install the screws, washers and nuts that attach the lock
 handles in their positions.


 (j)  
Move the coupling for the bleed air duct inboard until it
 stops.


 (k)  
Install the clamp that attaches the coupling for the bleed air duct to the bleed air flange. 1) Tighten the clamp nut to 45-55 pound-inches (5.1-6.2 N.m).


 S 094-015
 (6)  Remove the hoist equipment:
 (a)  
Loosen the hoist cables or chains.

 (b)  
Remove the pins to disconnect the hoist cables or chains from the tubes.

 (c)  
Remove the pins that attach the cradle base to the APU.

 (d)  
Remove the cradle.

 (e)  
Remove the pins that attach the hoists to the brackets in the APU compartment.

 (f)  
Remove the hoists.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 49-11-00
 ALL  ú ú 03 Page 411 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / GTCP85-129 SERIES /737-300/400/500/ ENGINES/MAINTENANCE MANUAL ////////////////////////
S 214-051
 (7)  AIRPLANES WITH THE DUCT ALIGNMENT ASSEMBLY (POST-SB 49-1101); Make sure there is a minimum clearance of 0.75 inch (1.9 mm) between the exhaust duct muffler and the exhaust port of the APU turbine section:
 (a)  If it is necessary, adjust the bolts that attach the duct alignment assembly to the brackets until the clearance is correct (AMM 49-81-31/401).
 S 434-016
 (8)  Connect the APU (Fig. 401):
 (a)  
Remove the caps, covers and plugs from all the disconnected lines and ports.

 (b)  
Connect the fuel hose to the elbow on the low pressure fuel filter (Fig. 401, Detail B).

 (c)  
Connect the plug for the fire detection sensor to the
 receptacle on the upper shroud.
 1) Install a lockwire on the plug.


 (d)  
Connect the air line for the bleed load control to the fitting in the upper shroud.

 (e)  
AIRPLANES WITH THE ETC; Connect the plug for the electronic temperature control to the upper shroud receptacle. 1) Install a lockwire on the plug.

 (f)  
Connect the plug for the EGT indication system to the
 receptacle in the upper shroud.
 1) Install a lockwire on the plug.


 (g)  
Connect the plug for the APU generator control to the
 receptacle in the upper shroud.
 1) Install a lockwire on the plug.


 (h)  
Connect the APU harness, the APU starter motor, and the APU generator plugs to the receptacles in the upper shroud. 1) Install lockwires on the connectors.

 (i)  
Connect the bonding jumper on the upper shroud to the APU (Fig. 401, Detail C).


 S 864-026
 (9)  Set the circuit breakers and the switch:
 (a)  Remove the DO-NOT-CLOSE tags and close these circuit breakers: 1) P6-2 Load Control Center a) FIRE PROTECTION DETECTION, APU 2) P6-4 Load Control Center a) CONTROL GENERATOR, APU
 3)  P6 Load Control Center
 a) APU CONT

 b)  BAT BUS AUTO
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 49-11-00
 ALL  ú ú 06 Page 412 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
S 634-017
 (10)
 Dry motor the APU (AMM 49-11-00/201).

 S 864-046

 (11)
 Make sure the lower shroud is installed and the APU cowl door is closed.

 S 714-023

 (12)
 Do the APU operation test (AMM 49-11-00/501).

 S 734-022

 (13)
 Do the test of the fire detection system for the APU (AMM 26-15-00/501).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 49-11-00
 ALL  ú ú 04 Page 413 ú Mar 12/01
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 AIRBORNE AUXILIARY POWER 1(90)