49-15-00
ALL ú ú 01 Page 511 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / GTCP85-129 SERIES /737-300/400/500/ ENGINES/MAINTENANCE MANUAL ////////////////////////
(b) Make sure the vortex generator flap operates smoothly.
S 715-023
(6) Do this task: "Air Inlet Door Test".
TASK 49-15-00-705-030
5. Air Inlet Door Test (Fig. 501)
___________________
A. Access
(1)
Location Zones
101 Control Cabin (Left)
701 Tail Compartment
(2)
Access Panels
3701 Stabilizer Trim Access Door
B. Procedure
S 225-024
(1) Make sure the air inlet door aligns correctly in the closed position:
(a)
Measure the position of the air inlet door in the closed position.
(b)
If the air inlet door does not align correctly, Do this task: "Air Inlet Door Adjustment".
S 865-025
(2) Set these switches on the P5 forward overhead panel:
(a)
Set the BAT switch to the ON position.
(b)
Set the APU master switch to the ON position and attach a DO-NOT-OPERATE tag.
(c)
After the air inlet door opens, set the BAT switch to the OFF position and attach a DO-NOT-OPERATE tag.
S 225-026
(3) Make sure the air inlet door aligns correctly in the open position:
(a) Measure the position of the air inlet door in the open position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 512 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(b) If the air inlet door does not align correctly, Do this task: "Air Inlet Door Adjustment".
(4) S 865-027Set these switches on the P5 forward overhead panel: (a) Remove the DO-NOT-OPERATE tag from the BAT switch. (b) Set the BAT switch to the ON position. (c) Remove the DO-NOT-OPERATE tag from the APU master switch. (d) Set the APU master switch to the OFF position.
NOTE:____ This will close the air inlet door.
(5) S 715-028Do a test of the air inlet door: (a) Set the APU master switch from the ON position to the OFF position again and again. (b) Make sure the actuator operates correctly.
(6) S 865-029Make sure the APU master switch is in the OFF position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-15-00
ALL ú ú 01 Page 513 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
AIR INLET DOOR - SERVICING
__________________________
1. General
_______
A. This procedure gives the task to lubricate the vortex generator hinge pin (which is referred to as the 'hinge pin'). It is not necessary to remove the vortex generator.
TASK 49-15-22-603-001
2. Vortex Generator Hinge Pin Lubrication (Fig. 301)
______________________________________
A. Equipment
(1)
Mallet - Rubber (commercially available)
(2)
Pin - Drift, 1/16 Inch Diameter (commercially available)
B. Consumable Materials
(1)
D00015 Grease - BMS 3-24
(2)
C00259 Primer - BMS 10-11
C. Access
(1)
Location Zones
101 Control Cabin (Left)
205 Electronic Compartment
701 Tail Compartment
(2)
Access Panels
1201 Electronic Equipment Access Door
D. Procedure
S 863-002
(1) Set the switch and the circuit breaker:
(a)
Set the APU master switch, on the P5 forward overhead panel, to the OFF position and attach a DO-NOT-OPERATE tag.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 AIRBORNE AUXILIARY POWER 1(133)