• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Install the pipe (4) and attach it with the coupling nuts (3) and (5).


 1EFF : ALL 1 29-13-48Page 409 1 1 Aug 01/02R 1 1 1CES 1


 Subtask 29-13-48-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV, 10CV, 12CV, 21CE1, 21CE2, 21CE3, 22CE, 3700GD, 3701GD.
 Subtask 29-13-48-860-052
 D. Aircraft Configuration
 (1)
 Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER from the flap/slat control lever on panel 114VU.

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Install the safety collar on the circuit breakers 10CV and 12CV.

 (4)
 Connect the PTU isolation coupling (Ref. TASK 29-23-00-860-002).


 (5)
 Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002). Subtask 29-13-48-710-050

 E.
 Test

 (1)
 Do an operational test of the flap WTB (Ref. TASK 27-51-00-710-001).

 (2)
 Make sure that the hydraulic connections of the check valve do not leak.

 


 5. Close-up
________
 (Ref. Fig. 401/TASK 29-13-48-991-001) Subtask 29-13-48-864-054
 A. Depressurize the Hydraulic System
 (1) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).
 1EFF : ALL 1 29-13-48Page 410 1 1 Aug 01/02R 1 1 1CES 1


 Subtask 29-13-48-865-053

 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21
 Subtask 29-13-48-410-050
 C. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
R  (2) Install the access panel 575DB (Ref. TASK 57-51-37-400-004). Subtask 29-13-48-865-054
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV.
 Subtask 29-13-48-866-051
 E. Aircraft Configuration WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
_______ CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.
 (1) Retract the spoiler 3 (Ref. TASK 27-60-00-866-002).
 (2)
 Retract the flaps fully (Ref. TASK 27-50-00-866-009).
 Subtask 29-13-48-942-050


 F.
 Removal of Equipment

 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and

 

 

 

 standard tools and all other items.

 

 HYDRAULIC TUBES - ENGINE 2 - REMOVAL/INSTALLATION
_________________________________________________
 TASK 29-13-49-000-001
 Removal of the Hydraulic Suction Hose/Tube Assembly
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 WARNING : DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
 CAUTION : DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC
_______ FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific protective covers
 No specific warning notice(s)
 No specific access platform 1.50 m (4 ft. 11 in.)
 No specific container 5 l (1.3208 USgal)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
R  71-13-00-010-040 Opening of the Fan Cowl Doors 29-13-49-991-904 Fig. 401 29-13-49-991-905 Fig. 402
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4(65)