 (2)
 Make sure that the pressure gage (2) shows 3000 +100 -100 psi.

 


 5. Close-up
________ Subtask 29-13-21-860-055
 A. Connect the isolation coupling of the Power Transfer Unit (PTU)
 (Ref. TASK 29-23-00-860-002).

 Subtask 29-13-21-410-050
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 196BB.

 


 Subtask 29-13-21-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1881GP, 3801GX, 3802GX, 3803GX.


 VALVE - CHARGING, YELLOW POWER ACCUMULATOR (3071GM) - REMOVAL/INSTALLATION
__________________________________________________________________________ TASK 29-13-22-000-001 Removal of the Accumulator-Gas Charging Valve (3071GM) WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific 1 CAP - BLANKING No specific 1 PLUG - BLANKING No specific 1 WARNING NOTICE
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 29-13-22-991-001 Fig. 401


 3. Job Set-up
__________
 Subtask 29-13-22-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 29-13-22-860-050
 B. Aircraft Maintenance Configuration
 (1)
 Put the WARNING NOTICE in position to tell persons not to pressurize the Yellow hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel
 -On the ground service panel of the Yellow hydraulic system.

 (2)
 Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-001).

 (4)
 Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-001).


 Subtask 29-13-22-010-051
 C. Open the access door 196BB.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-13-22-991-001) Subtask 29-13-22-614-050
 A. Depressurize the Power Accumulator (3070GM)
 (1)
 Remove the endcap (6) from the gas charging-valve (4).

 (2)
 Turn the nut (5) carefully to the OPEN position and release the nitrogen pressure.


 Subtask 29-13-22-020-050
 B. Removal of the Gas Charging-Valve (3071GM)
 (1)
 Cut, remove and discard the lockwire from the gas charging-valve (4).

 (2)
 Remove the gas charging-valve (4).

 (3)
 Install the PLUG - BLANKING in the adapter (2).

 (4)
 Install the CAP - BLANKING on the gas charging-valve (4).

 


 Gas Charging Valve
 Figure 401/TASK 29-13-22-991-001
 1EFF :  ALL  1  29-13-22 Page 404 
1  1  May 01/05
 1  1
 1CES  1

 

 TASK 29-13-22-400-001
 Installation of the Accumulator-Gas Charging Valve (3071GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 