29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access 36-12-00-710-001 Operational Test of the APU Bleed Air Supply and
 Crossbleed Systems

R  49-00-00-860-003 APU Start by External Power (GTCP 36-300)
R  49-00-00-860-004 APU Shutdown by External Power (GTCP 36-300) 49-00-00-860-005 APU Start by External Power (APS 3200) 49-00-00-860-006 APU Shutdown by External Power (APS 3200) 49-00-00-860-008 APU Start by External Power (131-9(A)) 49-00-00-860-009 APU Shutdown by External Power (131-9(A))


 3. Job Set-up
__________
 Subtask 29-14-00-010-054

 A. Get Access R (1) Open the access doors 195BB, 196BB, 197CB, 197EB, 197FB, 198CB.
 (2) Open the right main door of the main landing gear (Ref. TASK 32-12-00-010-001).
 Subtask 29-14-00-865-052
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------123VU B HYD/ELEC PUMP 2701GJ AB09 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 29-14-00-860-050
 C. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Depressurize the Green, Yellow and Blue hydraulic systems and put them in the maintenance configuration (Ref. TASK 29-00-00-864-001).

 (3)
 Put warning notices to tell persons not to pressurize the hydraulic systems:


 -in the flight compartment near the hydraulic section 40VU of the overhead panel,
 - on the ground service panels of the Green, Yellow and Blue hydraulic systems.
 (4)
 Depressurize the reservoirs of the Green, Yellow and Blue hydraulic systems (Ref. TASK 29-14-00-614-001).

 (5)
 Remove the blanking cap from the reservoir-pressurization ground connector (referred to as ground connector) on the reservoir pressurization unit 1360GM.

 (6)
 Connect the FILL UNIT - AIR (98D29003501000) to the ground connector.

 


 NOTE : If the pressurizing tool is not available, you can use an
____ alternative air supply. The supply must have a pressure of 5 bar (72.5 psi) and it must have a filter. The rating of the filter must be 5 microns or better.
 (7) Open the ground connector.
 4. Procedure
_________

R  **ON A/C 001-049, 101-105, 151-199, 201-210,
 Subtask 29-14-00-720-050-A
 A. Do this test:
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ground air supply:
 -set the supply at 5 bar (72.5
 psi).

 2.
 Pressurize the reservoirs of the  On the air pressure gages:
 three hydraulic systems - the pressure in each reservoir
 (Ref. TASK 29-14-00-614-002). increases to 50 psig.


 3.
 On the ground air supply: On the air pressure gages:


 -stop the supply of air to the  - the pressure in the reservoirs is reservoir pressurizing system. constant.
 -disconnect the ground supply
 from the ground connector but
 keep the ground connector open.

 4. On the ground connector:
 -close the ground connector.
 5. On the water separator:  On the air pressure gages:
 -push the drain valve in and  - the pressure in the reservoirs is hold it in the open position. constant.
 -release the drain valve of the
 water separator and allow it to
 go to the closed position.

 

 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
6. Depressurize the reservoirs of  On the air pressure gages:
 the three hydraulic systems  - the pressure in the reservoirs
 (Ref. TASK 29-14-00-614-001).  decreases to zero.
 7. Start the APU (Ref. TASK 49-00-
00-860-008).
 8. Set the bleed air supply from the  On the air pressure gages:
 