 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 CAP - BLANKING No specific 1 PLUG - BLANKING No specific 1 WARNING NOTICE No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003  F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 Material No. 05-004  USA MIL-L-25567 TYPE I OXYGEN LEAK DETECTOR (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
0-ring  29-14-14 01 -010


 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-14-29-614-001 Fill the Hydraulic Power Accumulators 1070GM/2070GM/3070GM with Nitrogen 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-863-002 Pressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) 29-23-00-860-002 Connection of the Isolation Coupling of the Power Transfer Unit (PTU) 29-13-22-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 29-13-22-860-051
 A. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Make sure that the WARNING NOTICE are in position to tell persons not to pressurize the Yellow hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel
 -On the ground service panel of the Yellow hydraulic system.

 (3)
 Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (4)
 Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).

 (5)
 Make sure that the access door 196BB is open.

 (6)
 Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. TASK 29-23-00-860-001).

 


 Subtask 29-13-22-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-13-22-991-001) Subtask 29-13-22-420-050
 A. Installation of the Gas Charging-Valve (3071GM)
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the PLUG - BLANKING from the adapter (2).

 (4)
 Remove the CAP - BLANKING from the gas charging-valve (4).

 (5)
 Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the gas charging-valve connection.

 (6)
 Make sure that the 0-ring seal (3) is installed on the gas charging-valve (4).

 (7)
 If the removed charging-valve (4) is to be installed, remove the used 0-ring seal (3) and install a new 0-ring (3).

 (8)
 Install the gas charging-valve (4) on the adapter (2).

 (9)
 TORQUE the gas charging-valve (4) to between 1.42 and 1.54 m.daN


 (10.47 and 11.35 lbf.ft).


 