R (e) Fill the clearances around the edges of the access panel (1) with
R SEALANTS (Material No. 09-016).
R (2) For the access panel 575LB(675LB):
R (a) Put the access panel (5) in position.
R (b) Install the bolts (6) but do not tighten. Make sure that you can
R move the access panel (5) sufficient to adjust its position.
R (c) Set the access panel (5) so that:
R - the dimension V is 2.0 mm (0.0787 in.) + 2.3 mm (0.0905 in.)/-
R 1.5 mm (0.0590 in.) along the full length of the panel
R - the dimension X is 4.0 mm (0.1574 in.) + 2.0 mm (0.0787 in.)/-
R 1.0 mm (0.0393 in.) along the full width of the panel
R - the dimension Z is 0.0 mm (0.0000 in.) + 0.5 mm (0.0196 in.)
R along the full length of the panel seal.
R NOTE : If the dimension Z is not in limits, you must adjust the____
R position of the panel seal (Ref. TASK 57-51-37-960-001).
R (d) TORQUE tighten the bolts (6) to between 0.4 and 0.45 m.daN (35.39
R and 39.82 lbf.in).
R (e) Fill the clearances around the edges of the access panel (5) with
R SEALANTS (Material No. 09-016).
R (3) For the access panel 575MB(675MB):
R (a) Put the access panel (10) in position.
R (b) Install the bolts (11) but do not tighten. Make sure that you can
R move the access panel (10) sufficient to adjust its position.
R (c) Set the access panel (10) so that:
R - the dimension V is 2.0 mm (0.0787 in.) + 2.3 mm (0.0905 in.)/-
R 1.5 mm (0.0590 in.) along the full length of the panel
R - the dimension W is 1.2 mm (0.0472 in.) +/- 0.5 mm (0.0196 in.)
R along the full width of the panel
R - the dimension X is 4.0 mm (0.1574 in.) + 2.0 mm (0.0787 in.)/-
R 1.0 mm (0.0393 in.) along the full width of the panel
R - the dimension Z is 0.0 mm (0.0000 in.) + 0.5 mm (0.0196 in.)
R along the full length of the panel seal.
R NOTE : If the dimension Z is not in limits, you must adjust the____
R position of the panel seal (Ref. TASK 57-51-37-960-001).
R (d) TORQUE tighten the bolts (11) to between 0.4 and 0.45 m.daN
R (35.39 and 39.82 lbf.in).
R (e) Fill the clearances around the edges of the access panel (10)
R with SEALANTS (Material No. 09-016).
R 5. Close-up________
R Subtask 57-51-37-942-056
R A. Removal of Equipment
R (1) Remove the TOOL-ZERO LOCKING, FLAP SLAT CTL LEVER from the flap/slat
R control lever.
R (2) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (3) Remove the access platform(s).
R (4) Remove the ground support and maintenance equipment, the special and
R standard tools and all other items.
R (5) Remove the warning notice(s).
R (6) Remove the safety barriers.
R TASK 57-51-37-000-006
R Removal of the Access Panel 575JB(675JB)
R WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______
R GEAR.
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______
R START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:_______
R - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
R - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
R - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼4(7)