______________________________________________________
 TASK 26-23-00-710-001
 Operational Test of the Cargo-Compartment Fire-Extinguishing System
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 26-16-00-710-001 Operational Check of Cargo-Compartment Smoke-Detection by PTT
 3. Job Set-up
__________ R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 26-23-00-861-050
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002)
 **ON A/C ALL
 Subtask 26-23-00-865-050
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
 49VU AIR COND/SDCU/CHAN1 11WQ C06 **ON A/C 001-049, 051-099, 101-105, 201-299,
 49VU COM/CIDS/DIR 1 AND 2/ESS 150RH G02 R **ON A/C 106-149, 301-399, 401-499,
 49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06
 49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05
R **ON A/C 106-149, 401-499,
 49VU COM/CIDS/DIR ESS/2 157RH G02 R **ON A/C 106-149, 151-199, 301-399, 401-499,
 49VU COM DIR ESS/1 150RH G01 **ON A/C 151-199, 301-399,
 49VU COM DIR ESS/2 157RH G02 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
 121VU COM NAV/CIDS/DIR 1 AND 2/NORM 151RH M05
R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 106-149, 151-199, 401-499, 
 121VU COM NAV/CIDS/DIR NORM/2 **ON A/C 301-399, 156RH  M06 
 121VU COM NAV/CIDS/DIR NORM/2 121VU COM NAV/CIDS/DIR NORM/1 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 156RH 151RH  M07M06 
R  122VU AIR COND/SDCU/CHAN2 12WQ **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499, T18  
R  122VU AIR COND/CARGO/FIRE/EXTIG **ON A/C 106-149, 301-399, 401-499, 1WX  T19  
122VU AIR COND/CIDS/SDF/DIR NORM/2 122VU AIR COND/CIDS/SDF/DIR NORM/1 **ON A/C ALL 14WH 17WH  T18T17 
 4. Procedure_________  
R  **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499, 
 Subtask 26-23-00-710-050 
 A. Do the operational test of the cargo-compartment smoke-detection system by PTT(Ref. TASK 26-16-00-710-001).
 TASK 26-23-00-720-001
 Check Firing Circuit Continuity
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 262300-02
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 1.6 m (5 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火2(94)