______________________________________________________
TASK 26-23-00-710-001
Operational Test of the Cargo-Compartment Fire-Extinguishing System
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 26-16-00-710-001 Operational Check of Cargo-Compartment Smoke-Detection by PTT
3. Job Set-up
__________ R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 26-23-00-861-050
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
**ON A/C ALL
Subtask 26-23-00-865-050
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
49VU AIR COND/SDCU/CHAN1 11WQ C06 **ON A/C 001-049, 051-099, 101-105, 201-299,
49VU COM/CIDS/DIR 1 AND 2/ESS 150RH G02 R **ON A/C 106-149, 301-399, 401-499,
49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06
49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05
R **ON A/C 106-149, 401-499,
49VU COM/CIDS/DIR ESS/2 157RH G02 R **ON A/C 106-149, 151-199, 301-399, 401-499,
49VU COM DIR ESS/1 150RH G01 **ON A/C 151-199, 301-399,
49VU COM DIR ESS/2 157RH G02 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
121VU COM NAV/CIDS/DIR 1 AND 2/NORM 151RH M05
R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 106-149, 151-199, 401-499,
121VU COM NAV/CIDS/DIR NORM/2 **ON A/C 301-399, 156RH M06
121VU COM NAV/CIDS/DIR NORM/2 121VU COM NAV/CIDS/DIR NORM/1 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 156RH 151RH M07M06
R 122VU AIR COND/SDCU/CHAN2 12WQ **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499, T18
R 122VU AIR COND/CARGO/FIRE/EXTIG **ON A/C 106-149, 301-399, 401-499, 1WX T19
122VU AIR COND/CIDS/SDF/DIR NORM/2 122VU AIR COND/CIDS/SDF/DIR NORM/1 **ON A/C ALL 14WH 17WH T18T17
4. Procedure_________
R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 26-23-00-710-050
A. Do the operational test of the cargo-compartment smoke-detection system by PTT(Ref. TASK 26-16-00-710-001).
TASK 26-23-00-720-001
Check Firing Circuit Continuity
1. Reason for the Job
__________________
Refer to the MPD TASK: 262300-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火2(94)