1EFF : ALL 1 26-22-00Page 409 1 1 May 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------NOTE : If the test is correct,
____
the firing system will
operate correctly. The
test system is defective.
NOTE : If the test is not correct
____
(no voltage), the firing
system is defective and do
the applicable trouble
shooting procedure.
5. Close-up
________
Subtask 26-22-00-865-073
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/FIRE/EXTIG/SQUIB/B 2WF L39 121VU APU/FIRE/EXTIG/SQUIB/A 1WF L38
Subtask 26-22-00-410-060
B. Put the aircraft back to its initial configuration.
(1)
Remove the SHUNT PLUG - FIRE EXTINGUISHER CARTRIDGE (2-100831-1) from the cartridge 12WF.
(2)
Make sure that the electrical connectors are clean and in the correct condition.
(3)
Connect the connector 12WF-A to the cartridge 12WF.
(4)
Safety the connector 12WF-A with corrosion-resistant steel lockwire
0.8 mm (0.032 in.) dia.
(5)
Disconnect the 600 ohm boomset from the service interphone jack.
(6)
Disconnect the 600 ohm headset from the CAPT jack panel.
(7)
Make sure that the work area is clean and clear of tool(s) and other items.
1EFF : ALL 1 26-22-00Page 410 1 1 May 01/05R 1 1 1CES 1
(8)
Close the access door 314AR.
(9)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(10)
Remove the access platform(s).
(11)
Remove the warning notice from the panel 25VU.
(12)
Put the warning notice in the cockpit to tell the flight crew that the APU AGENT SQUIB light is deactivated.
(13) Make an entry in the aircraft technical logbook. Subtask 26-22-00-865-074
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1WF, 2WF.
Subtask 26-22-00-860-059
D. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 26-22-00Page 411 1 1 May 01/05R 1 1 1CES 1
INTENTIONALLY BLANK
R 1 1
26-22-00Page 412
1 1 May 01/05 1 1 1CES 1 TASK 26-22-00-040-006
Test Circuit Verification
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
WARNING : THE CARTRIDGE IS AN EXPLOSIVE DEVICE. REMOVE IT BEFORE YOU
_______ DISASSEMBLE THE FIRE EXTINGUISHER BOTTLE. TO PREVENT INJURY TO THE PERSONNEL BECAUSE OF THE EXPLOSION OF THE CARTRIDGE IF IT HAS NOT BEEN FIRED:
-INSTALL A SHUNT DEVICE.
-THIS WILL SHUNT THE PINS TOGETHER ON THE CARTRIDGE BEFORE ITS
REMOVAL.
DO NOT USE A FOIL SHUNT.
1. Reason for the Job
__________________
Refer to the MMEL TASK: 26-22-04