R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
3. Job Set-up
__________
Subtask 26-23-41-860-052
A. Aircraft Maintenance Configuration
(1)
Make sure that the access platform is in position at the zone 825.
(2)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
**ON A/C 004-049, 051-099, 101-149, 201-299,
Subtask 26-23-41-010-060
B. Get Access
(1)
Make sure that the FWD cargo compartment door 825 is open (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the CARGO COMPT LIGHT switch 6LU is in the ON position.
(3)
Make sure that the protection panel 132MW is removed.
(4)
Make sure that the SHUNT PLUG - FIRE EXTINGUISHER CARTRIDGE, HTL (10-101950-81) are installed on the cartridges (7) and (14).
R **ON A/C 151-199, 401-499,
Subtask 26-23-41-010-060-A
B. Get Access
(1)
Make sure that the FWD cargo compartment door 825 is open (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the CARGO COMPT LIGHT switch 6LU is in the ON position.
(3)
Make sure that the protection panel 132SW is removed.
R 1EFF : 004-049, 051-099, 101-149, 151-199, 1 26-23-41Page 412 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(4) Make sure that the SHUNT PLUG - FIRE EXTINGUISHER CARTRIDGE, HTL (10-101950-81) are installed on the cartridges (7) and (14).
**ON A/C 301-399,
Subtask 26-23-41-010-060-B
B. Get Access
(1)
Make sure that the FWD cargo compartment door 825 is open (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the CARGO COMPT LIGHT switch 6LU is in the ON position.
(3)
Make sure that the protection panel 132MW is removed.
(4)
Make sure that the PROTECTIVE CAP - FIRE EXTINGUISHER CARTRIDGE (861823) are installed on the cartridges (7) and (14).
R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 26-23-41-865-058
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU AIR COND/CARGO/FIRE/EXTIG 1WX T19
4. Procedure
_________
**ON A/C 004-049, 051-099, 101-149, 201-299,
(Ref. Fig. 401/TASK 26-23-41-991-001) R **ON A/C 151-199, 401-499,
(Ref. Fig. 401A/TASK 26-23-41-991-001-A)
R 1EFF : 004-049, 051-099, 101-149, 151-199, 1 26-23-41Page 413 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
**ON A/C 301-399,
(Ref. Fig. 401B/TASK 26-23-41-991-001-B) R **ON A/C 004-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 26-23-41-420-055
A. Installation of the Cartridges
(1)
Remove the blanking plugs from the discharge heads (5) and (12).
(2)
Put the bonding strip (13) on the cartridge (14) and install a new O-ring (30).
(3)
Install the cartridge (14) on the discharge head (12).
(a)
TORQUE the cartridge (14) to between 90 and 100 lbf.in (1.01 and
1.13 m.daN).
(b)
Safety the cartridge (14) with corrosion-resistant steel lockwire dia. 0.8 mm (0.030 in).