• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 08:43来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install each serviceable or replacement fire-extinguisher in its support bracket, and attach/close the strap/clamp.

 (3)
 If necessary, close the door/access panel of the stowage compartment.

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 Subtask 26-24-00-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)

 1EFF : ALL 1 26-24-00Page 606 1 1 Nov 01/04R 1 1 1CES 1

 TASK 26-24-00-210-002


R Check Pressure Gauge Reading
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 262441-01


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 3. Job Set-up
__________
 Subtask 26-24-00-861-051

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)

 4. Procedure
_________
 Subtask 26-24-00-210-051

 A. Do a check of the portable fire extinguishers
 (1) On the portable fire extinguisher, make sure that the needle is in the green area of the pressure gauge.
 5. Close-up
________
 Subtask 26-24-00-862-051

 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)


 TASK 26-24-00-280-001


R Hydrostatic Test of Bottles
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 262441-02


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 3. Job Set-up
__________
 Subtask 26-24-00-861-052

 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)

 4. Procedure
_________
 Subtask 26-24-00-010-052

 A. Remove the portable fire extinguisher(s) from the related bracket(s). Subtask 26-24-00-280-050
 B. In the workshop:
 (1) Do the hydrostatic test of the portable fire extinguisher(s).
 Subtask 26-24-00-410-050

 C. Install the portable fire extinguisher(s) in the related bracket(s).

 5. Close-up
________

 Subtask 26-24-00-862-052
 A. De-energize the ground service network (Ref. TASK 24-42-00-862-001)


R TASK 26-24-00-210-003


R Weight Check of the Portable Fire Extinguisher R 1. Reason for the Job
__________________ R Refer to the MPD TASK: 262441-03 R 2. Job Set-up Information
______________________
R A. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-42-00-861-001 R R 24-42-00-862-001 R Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External Power

R **ON A/C 001-049, 101-149, 151-199, 201-299,
R 26-24-00-991-001 Fig. 601 R **ON A/C 301-399,

R 26-24-00-991-001-A Fig. 601A R **ON A/C ALL
R 3. Job Set-up
__________ R Subtask 26-24-00-861-053 R A. Energize the ground service network
R (Ref. TASK 24-42-00-861-001).


R Subtask 26-24-00-010-054

R  B. Get Access 
R  **ON A/C 001-049, 101-149, 151-199, 201-299, 
R  (Ref. Fig. 601/TASK 26-24-00-991-001) 
R  **ON A/C 301-399, 
R  (Ref. Fig. 601A/TASK 26-24-00-991-001-A) 
R  **ON A/C ALL 
R  NOTE : The fire-extinguisher locations are shown with placards, which are____ 
R  bonded on the outside of the stowage compartments, or adjacent to 
R  them. 
R  (1) If necessary, open the door/access panel of the stowage compartment. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火2(112)