Install each serviceable or replacement fire-extinguisher in its support bracket, and attach/close the strap/clamp.
(3)
If necessary, close the door/access panel of the stowage compartment.
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 26-24-00-862-050
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
1EFF : ALL 1 26-24-00Page 606 1 1 Nov 01/04R 1 1 1CES 1
TASK 26-24-00-210-002
R Check Pressure Gauge Reading
1.
Reason for the Job
__________________
Refer to the MPD TASK: 262441-01
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
__________
Subtask 26-24-00-861-051
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001)
4. Procedure
_________
Subtask 26-24-00-210-051
A. Do a check of the portable fire extinguishers
(1) On the portable fire extinguisher, make sure that the needle is in the green area of the pressure gauge.
5. Close-up
________
Subtask 26-24-00-862-051
A. De-energize the ground service network
(Ref. TASK 24-42-00-862-001)
TASK 26-24-00-280-001
R Hydrostatic Test of Bottles
1.
Reason for the Job
__________________
Refer to the MPD TASK: 262441-02
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
__________
Subtask 26-24-00-861-052
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001)
4. Procedure
_________
Subtask 26-24-00-010-052
A. Remove the portable fire extinguisher(s) from the related bracket(s). Subtask 26-24-00-280-050
B. In the workshop:
(1) Do the hydrostatic test of the portable fire extinguisher(s).
Subtask 26-24-00-410-050
C. Install the portable fire extinguisher(s) in the related bracket(s).
5. Close-up
________
Subtask 26-24-00-862-052
A. De-energize the ground service network (Ref. TASK 24-42-00-862-001)
R TASK 26-24-00-210-003
R Weight Check of the Portable Fire Extinguisher R 1. Reason for the Job
__________________ R Refer to the MPD TASK: 262441-03 R 2. Job Set-up Information
______________________
R A. Referenced Information
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-42-00-861-001 R R 24-42-00-862-001 R Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External Power
R **ON A/C 001-049, 101-149, 151-199, 201-299,
R 26-24-00-991-001 Fig. 601 R **ON A/C 301-399,
R 26-24-00-991-001-A Fig. 601A R **ON A/C ALL
R 3. Job Set-up
__________ R Subtask 26-24-00-861-053 R A. Energize the ground service network
R (Ref. TASK 24-42-00-861-001).
R Subtask 26-24-00-010-054
R B. Get Access
R **ON A/C 001-049, 101-149, 151-199, 201-299,
R (Ref. Fig. 601/TASK 26-24-00-991-001)
R **ON A/C 301-399,
R (Ref. Fig. 601A/TASK 26-24-00-991-001-A)
R **ON A/C ALL
R NOTE : The fire-extinguisher locations are shown with placards, which are____
R bonded on the outside of the stowage compartments, or adjacent to
R them.
R (1) If necessary, open the door/access panel of the stowage compartment.