(2)
 Install each serviceable or replacement fire-extinguisher in its support bracket, and attach/close the strap/clamp.
 (3)
 If necessary, close the door/access panel of the stowage compartment.
 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.
 Subtask 26-24-00-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)
1EFF : ALL 1 26-24-00Page 606 1 1 Nov 01/04R 1 1 1CES 1
TASK 26-24-00-210-002
R Check Pressure Gauge Reading
 1.
 Reason for the Job
__________________
 Refer to the MPD TASK: 262441-01
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 3. Job Set-up
__________
 Subtask 26-24-00-861-051
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)
 4. Procedure
_________
 Subtask 26-24-00-210-051
 A. Do a check of the portable fire extinguishers
 (1) On the portable fire extinguisher, make sure that the needle is in the green area of the pressure gauge.
 5. Close-up
________
 Subtask 26-24-00-862-051
 A. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)
 TASK 26-24-00-280-001
R Hydrostatic Test of Bottles
 1.
 Reason for the Job
__________________
 Refer to the MPD TASK: 262441-02
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
 3. Job Set-up
__________
 Subtask 26-24-00-861-052
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)
 4. Procedure
_________
 Subtask 26-24-00-010-052
 A. Remove the portable fire extinguisher(s) from the related bracket(s). Subtask 26-24-00-280-050
 B. In the workshop:
 (1) Do the hydrostatic test of the portable fire extinguisher(s).
 Subtask 26-24-00-410-050
C. Install the portable fire extinguisher(s) in the related bracket(s).
 5. Close-up
________
 Subtask 26-24-00-862-052
 A. De-energize the ground service network (Ref. TASK 24-42-00-862-001)
R TASK 26-24-00-210-003
R Weight Check of the Portable Fire Extinguisher R 1. Reason for the Job
__________________ R Refer to the MPD TASK: 262441-03 R 2. Job Set-up Information
______________________ 
R A. Referenced Information 
R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-42-00-861-001 R R 24-42-00-862-001 R Energize the Ground Service Network from the External Power De-energize the Ground Service Network Supplied from the External Power
R **ON A/C 001-049, 101-149, 151-199, 201-299, 
R 26-24-00-991-001 Fig. 601 R **ON A/C 301-399,
R 26-24-00-991-001-A Fig. 601A R **ON A/C ALL 
R 3. Job Set-up
__________ R Subtask 26-24-00-861-053 R A. Energize the ground service network 
R (Ref. TASK 24-42-00-861-001).
R Subtask 26-24-00-010-054
R  B. Get Access  
R  **ON A/C 001-049, 101-149, 151-199, 201-299,  
R  (Ref. Fig. 601/TASK 26-24-00-991-001)  
R  **ON A/C 301-399,  
R  (Ref. Fig. 601A/TASK 26-24-00-991-001-A)  
R  **ON A/C ALL  
R  NOTE : The fire-extinguisher locations are shown with placards, which are____  
R  bonded on the outside of the stowage compartments, or adjacent to  
R  them.  
R  (1) If necessary, open the door/access panel of the stowage compartment.  
 