• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

No specific lockwire
 No specific safety barriers
 No specific warning notice(s)

R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)

R 1EFF : 001-004, 051-054, 1 32-51-19Page 405 1 1 May 01/05 1 1 1CES 1


 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-047  C Z-11.904 ANTI COR. COMPOUND(HIGH TEMP.SILICONE SEALANT) (Ref. 20-31-00)
 Material No. 09-001  USA MIL-S-8802 TYPE I CLASS A FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)
 Material No. 11-004A 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
packing  32-51-19 01 -050
 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-22-00-410-001 Nose Gear Doors - Ground Doors Closing 32-51-00-710-001 Operational Test of the Nose Wheel Steering with the
 CFDS. 32-51-19-220-001 Check of the Voltage at the Nose Wheel Steering Feedback Sensor (3GC,4GC) 32-51-19-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 32-51-19-860-051
 A. Aircraft Maintenance Configuration
 (1) In the cockpit, on the panel 400VU, make sure that the warning notice(s) is (are) in position to tell persons not to operate the landing gear control lever.
R 1EFF : 001-004, 051-054, 1 32-51-19Page 406 1 1 May 01/05 1 1 1CES 1


 (2)
 Make sure that on the steering handwheels (CAPT and F/O) and on the brake pedals, make sure that the warning notice(s) is (are) in position to tell persons not to operate them.

 (3)
 Make sure that the safety barriers are in position.

 (4)
 Make sure that the doors of the nose landing gear are open (Ref. TASK 32-22-00-010-001).


 Subtask 32-51-19-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
 4. Procedure
_________
 (Ref. Fig. 401/TASK 32-51-19-991-001) Subtask 32-51-19-110-050
 A. Preparation of the Replacement Component
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Clean the attachment hardware with CLEANING AGENTS (Material No. 11-004A) and dry with filtered compressed air.

 (3)
 Apply a light coat of SPECIAL MATERIALS (Material No. 05-047) to the threads of all the nuts.


 Subtask 32-51-19-420-050
 B. Installation of the Sensor
 (1)
 Install a new packing (7).

 (2)
 Put the sensor (5) on the reducer (1) and engage the spigot (2) in its housing on the reducer (1).


R 1EFF : 001-004, 051-054, 1 32-51-19Page 407 1 1 May 01/05 1 1 1CES 1


 (3)
 Make sure that the locating pin (3) is in the correct position.

 (4)
 Install the screws (4) and tighten them.

 (5)
 TORQUE the screws (4) to between 0.15 and 0.2 m.daN (13.27 and 17.69 lbf.in).

 (6)
 Safety the screws (4) with lockwire

 (7)
 Remove the blanking caps from the electrical connectors.

 (8)
 Check the voltage at the sensor connector (Ref. TASK 32-51-19-220-001).

 (9)
 Connect the connector (6) to the sensor (5).


 (10) Apply SEALANTS (Material No. 09-001) on the heads of the screws (4). Subtask 32-51-19-865-054
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG
 Subtask 32-51-19-710-050
 D. Operational Test
 (1) Do the operational test of the nose wheel steering (Ref. TASK 32-51-00-710-001).
 5. Close-up
________ Subtask 32-51-19-860-050
 A. Put the aircraft back to its initial configuration.
 (1)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架9(40)