 Nose Wheel Alignment Tool Figure 520/TASK 32-51-00-991-022 
R 1EFF : 1 1 1CES  ALL  1 111 32-51-00 Page A545 Aug 01/05

 

 Reference points for the front target Figure 521/TASK 32-51-00-991-039 
R 1EFF : 1 1 1CES  ALL  1 111 32-51-00 Page A546 Aug 01/05

 

 Reference Points for the Rear Target
 Figure 522/TASK 32-51-00-991-040

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-51-00Page A547 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (7) Jack up the NLG axle enough to spin the two wheels (Ref. TASK 07-12-00-582-001)
 -put a thick layer of COMMON GREASE (Material No. 04-004) on the pivoting cup of the axle jack
 -jack up the NLG axle enough to spin the two wheels
 Subtask 32-51-00-865-108
 C. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL ------ DESIGNATION ------------------------------------------------------- IDENT. LOCATION------------------
121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY  4GG  M36
 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL  3GG  M35
 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL  1GG  M34
 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY  2GG  M33
 Subtask 32-51-00-865-109
 D. Open, safety and tag this(these) circuit breaker(s):
 ------PANEL  -------------------------------------------------------DESIGNATION  ------------------IDENT. LOCATION

 -------------------------------------------------------------------------------121VU ENGINE/ENG2/OIL/PRESS 2EN2 N42 121VU ENGINE/ENG1/OIL/PRESS 2EN1 N40
 4. Procedure
_________
 (Ref. Fig. 523/TASK 32-51-00-991-024, 524/TASK 32-51-00-991-025, 525/TASK
 32-51-00-991-026)
 Subtask 32-51-00-220-065
 A. Align the NWS at the zero position with the NOSE WHEEL ALIGNMENT TOOL
 (1)
 Use the NOSE WHEEL ALIGNMENT TOOL and the manufacturer's instructions to measure the NWS

 (2)
 Use the rudder trim to align the nose wheels to the zero position as shown on the NOSE WHEEL ALIGNMENT TOOL display

 (3)
 Depressurize the green hydraulic system (Ref. TASK 29-10-00-864-001)


R 1EFF : 001-004, 051-054, 1 32-51-00Page A548 1 1 Aug 01/05 1 1 1CES 1


 Reference Points for the rear Target
 Figure 522A/TASK 32-51-00-991-040-A 
R 1EFF :  301-399,  1  32-51-00 Page A549 
1  1  Aug 01/05
 1  1
 1CES  1

 

 Adjustment of the NWS Position - Sensor P/N C24763000
 Figure 523/TASK 32-51-00-991-024

R 1EFF : ALL 1 32-51-00Page A550 1 1 Aug 01/05 1 1 1CES 1


 Adjustment of the Gear Box P/N C24764000 with tool M46196
 Figure 524/TASK 32-51-00-991-025

R 1EFF : ALL 1 32-51-00Page A551 1 1 Aug 01/05 1 1 1CES 1


 Calculated Chart - Sensor P/N C24763000 with tool M46196
 Figure 525/TASK 32-51-00-991-026

 1EFF : ALL 1 32-51-00Page A552 1 1 Aug 01/05R 1 1 1CES 1


 (4) Monitor the NOSE WHEEL ALIGNMENT TOOL display to make sure that the nose wheels stays at the zero position
 NOTE : If the nose wheels haved moved, recenter the nose wheels to
____ the zero position with the BAR - STEERING NOSE WHEEL (98A09003000001)
 Subtask 32-51-00-820-067
 B. Set the NWS Zero position for the sensor 3GC
 NOTE : The voltages U1 and U2 are in volts (3V approximately)

____
 NOTE : The adjustment process is very sensitive

____
 NOTE : Do not move the wheels manually

____
 (1)
 Make sure that the C/Bs 1GG and 2GG are closed

 (2)
 Open, safety and tag the C/Bs 3GC and 4GC

 (3)
 On the panel 402VU, put the A/SKID & N/W STRG switch in OFF position

 (4)
 Disconnect the connector from the RVDT 3GC

 (5)
 Connect the SENSOR-VOLTAGE TEST (F26792000) or the SENSOR - VOLTAGE TEST (F26792000-1) between the connector and the RVDT 3GC

 (6)
 On the panel 402VU, put the A/SKID & N/W STRG switch in ON position

 (7)
 Connect a AC voltmeter

 (8)
 Stage 1:

 (a)
 On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (2) set the selector switch to U1.

 (b)
 Record the voltage (U1).

 (c)
 On the SENSOR-VOLTAGE TEST (F26792000) or SENSOR - VOLTAGE TEST

 (2) set the selector switch to U2.
 