(2)
Install the screws (4) and the washers (3).
(3)
Tighten the screws (4).
(4)
Remove the blanking cap from the connector (2).
(5)
Make sure that the electrical connectors are clean and in the correct condition.
(6)
Connect the electrical connector (2) to the electrical box (1).
(7)
Apply SEALANTS (Material No. 09-001) on the heads of the screws (4).
1EFF : ALL 1 32-51-12Page 405 1 1 Feb 01/98 1 1 1CES 1 Subtask 32-51-12-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG
Subtask 32-51-12-720-050
C. Test
(1) Do the functional test of the nose wheel steering deactivation electrical-box (Ref. TASK 32-51-00-720-005).
5. Close-up
________ Subtask 32-51-12-942-050
A. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the warning notice(s).
1EFF : ALL 1 32-51-12Page 406 1 1 Feb 01/98 1 1 1CES 1R SWIVEL SELECTOR VALVE - REMOVAL/INSTALLATION
____________________________________________ TASK 32-51-15-000-001 R Removal of the Swivel Selector Valve WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
No specific safety barriers
No specific warning notice(s)
No specific access platform 2.06 m (6 ft. 9 in.)
No specific container 2.5 l (0.6604 USgal)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
1EFF : ALL 1 32-51-15Page 401 1 1 Nov 01/98 1 1 1CES 1 1EFF : ALL 1 32-51-15Page 402 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 32-51-15Page 403 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL
3. Job Set-up__________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 32-51-15-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-00-00-864-001).
(2) Depressurize the reservoir of the Green Hydraulic System (Ref. TASK 29-14-00-614-001).
R **ON A/C 401-499,
R Subtask 32-51-15-860-050-A
R A. Aircraft Maintenance Configuration
R R (1) Make sure that the Yellow hydraulic system is depressurized (Ref. TASK 29-00-00-864-001).
R R (2) Depressurize the reservoir of the Yellow Hydraulic System (Ref. TASK 29-14-00-614-001).
R **ON A/C ALL
Subtask 32-51-15-010-050
B. Get Access
(1) Open the nose landing-gear doors (Ref. TASK 32-22-00-010-001).
(2) Put the access platform in position in zone 123.
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 32-51-15-941-050
C. Safety Precautions
(1) Put the warning notice(s) in position to tell persons not to operate the landing gear.
(2) Put the safety barriers in position.
(3) Put the warning notice(s) in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU, in the cockpit, - on the ground service panel of the Green hydraulic system, access door 197CB.
(4) Put a container in position below the rotating joint.
R **ON A/C 401-499,
R Subtask 32-51-15-941-050-A
R C. Safety Precautions