• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 -COMPONENTS THAT MOVE.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
32-51-00-720-003 Functional Test of the Nose Wheel Steering with the Handwheel. 32-51-00-720-006 Functional Test of the Rudder Bar.
 **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,
 32-51-11-991-001 Fig. 401 R **ON A/C 106-149, 159-199, 211-299, 301-399, 401-499,
 32-51-11-991-001-A Fig. 401A
 1EFF : ALL 1 32-51-11Page 406 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 3. Job Set-up
__________
 Subtask 32-51-11-865-051

 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,

 (Ref. Fig. 401/TASK 32-51-11-991-001) R **ON A/C 106-149, 159-199, 211-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 32-51-11-991-001-A)
 **ON A/C ALL

 Subtask 32-51-11-420-050
 A. Installation of the Transmitter (8)
 (1)
 Remove the blanking caps from the electrical connectors.

 (2)
 Connect the electrical connector (9) to the transmitter unit (8).

 (3)
 Make sure that the electrical connectors are clean and in the correct condition.

 (4)
 Put the unit (8) in position in its housing.

 (5)
 Install and tighten the screws (7).


 1EFF : ALL 1 32-51-11Page 407 1 1 Aug 01/05 1 1 1CES 1 Subtask 32-51-11-410-050


 B. Installation of the Cover of the Panel 19VU (18VU)
 (1)
 Put the cover (4) in position and close the fasteners (1).

 (2)
 Install the washers (6) and the screws (5). Tighten the screws (5).

 (3)
 Install the washer (11) and the screw (10). Tighten the screw (10).

 (4)
 Release the lock (2) and install the handle (3) on the transmitter unit (8).


 Subtask 32-51-11-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG
 Subtask 32-51-11-710-050
 D. Operational Test
 (1) Do the functional test of the Nose Wheel Steering with the Handwheel (Ref. TASK 32-51-00-720-003).
R (2) Do the functional test of Rudder bar(Ref. TASK 32-51-00-720-006) .
 5. Close-up
________
 Subtask 32-51-11-942-050

 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-51-11Page 408 1 1 Nov 01/04 1 1 1CES 1 ELECTRICAL BOX - NOSE WHEEL STEERING DEACTIVATION (5GC) - REMOVAL/INSTALLATION


______________________________________________________________________________ TASK 32-51-12-000-001 Removal of the Nose Wheel Steering Deactivation Electrical Box WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______ OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
 WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架9(34)