 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
 OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 1. Reason for the Job
__________________
 Do this procedure when you have a sensor P/N C24763000 and a gearbox P/N C24764000 installed on the NLG.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific safety barriers
 No specific warning notice(s)

 1EFF : ALL 1 32-51-19Page 401 1 1 May 01/05 1 1 1CES 1


 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-51-19-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 32-51-19-941-051
 A. Safety Precautions
 (1)
 In the cockpit, on the panel 400VU, put warning notice(s) in position to tell persons not to operate the landing gear control lever.

 (2)
 On the steering handwheels (CAPT and F/O) and on the brake pedals, put warning notice(s) in position to tell persons not to operate them.


 (3) Put the safety barriers in position. Subtask 32-51-19-865-051
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
 Subtask 32-51-19-010-050
 C. Get Access
 (1) Open the doors of the nose landing gear (Ref. TASK 32-22-00-010-001).
R 1EFF : 001-004, 051-054, 1 32-51-19Page 402 1 1 May 01/05 1 1 1CES 1


 4. Procedure
_________
 (Ref. Fig. 401/TASK 32-51-19-991-001) Subtask 32-51-19-020-052
 A. Removal of the Sensor
 (1)
 Disconnect the electrical connector (6) from the sensor (5).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Remove the lockwire and the screws (4).

 (4)
 Remove the sensor (5).

 (5)
 Remove and discard the packing (7).


R 1EFF : 001-004, 051-054, 1 32-51-19Page 403 1 1 May 01/05 1 1 1CES 1


 Nose Wheel Steering Feedback Sensor P/N C24763000
 Figure 401/TASK 32-51-19-991-001

R 1EFF : 001-004, 051-054, 1 32-51-19Page 404 1 1 May 01/05 1 1 1CES 1 TASK 32-51-19-400-001


 Installation of the Nose Wheel Steering Feedback Sensor (3GC, 4GC) P/N C24763000 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
 CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
 OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 1. Reason for the Job
__________________
 Do this procedure when you must install a sensor P/N C24763000 on the NLG. You must install the sensor P/N C24763000 on the gearbox P/N C24764000.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 