• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  or 
R  (2) Depressurize the Yellow hydraulic system (through the PTU) (Ref. TASK 
R  29-24-00-864-001). 
R  (3) Remove the false targets from: 
R  (a) The NLG extension proximity sensors 24GA and 25GA. 
R  (b) The MLG extension proximity sensors: 
R  - for the LH MLG 21GA and 23GA 
R  - for the RH MLG 20GA and 22GA. 
R  (4) Remove the brace tool from the applicable MLG lockstay actuating 
R  cylinder (Ref. TASK 32-00-00-080-001). 
R  (5) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002). 
R  (6) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
R  002). 
R  Subtask 32-31-00-410-076 
R  B. Close Access 
R  (1) Close the MLG doors (Ref. TASK 32-12-00-410-001). 
R  (2) Remove the GROUND SAFETY LOCK (D23080000). 
R  (3) Close the NLG doors (Ref. TASK 32-22-00-410-001). 
R  Subtask 32-31-00-869-116 
R  C. Ground Configuration after Flight Configuration Precautions 
R  (1) Do the ground configuration after flight configuration precautions 
R  (Ref. TASK 32-00-00-860-002).

 

R  Subtask 32-31-00-942-095 
R  D. Removal of Equipment 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Remove the safety barriers. 
R  (3) Remove the warning notice(s). 
R  (4) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items.

 

 NORMAL EXTENSION AND RETRACTION - INSPECTION/CHECK
__________________________________________________ TASK 32-31-00-200-001 Detailed Visual Inspection of Landing Gear Uplock, Door Uplock Units and Pins WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 323100-02


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice
 No specific adjustable access platform 3 m (9 ft. 10 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 11-026 GB DEF-STAN 68-148/1 R SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 1EFF : ALL 1 32-31-00Page 601 1 1 Nov 01/02 1 1 1CES 1 1EFF : ALL 1 32-31-00Page 602 1 1 Nov 01/02 1 1 1CES 11EFF : ALL 1 32-31-00Page 603 1 1 Nov 01/02 1 1 1CES 1


 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-00-00-481-001 32-00-00-481-002 32-12-00-010-001 32-12-00-410-001 32-22-00-010-001 32-22-00-410-001 32-31-00-991-002 32-31-00-991-003  Installation of the Safety Devices on the Landing GearsInstallation of the Safety Devices on the Landing Gear DoorsOpen the Main Gear Doors for AccessClose the Main Gear Doors after AccessNose Gear Doors - Ground Doors OpeningNose Gear Doors - Ground Doors ClosingFig. 601Fig. 602
 3. Job Set-up__________
 Subtask 32-31-00-941-054
 A. Safety Precautions
 (1) Put the safety barriers in position.
 (2) Make sure that the ground safety locks are on the landing gear (Ref. TASK 32-00-00-481-001).
R R R R  (3) On the panel 400VU: - make sure that the landing-gear control-lever 6GA is in the DOWN position - put a warning notice in position to tell persons not to operate the landing gear.
 Subtask 32-31-00-010-051
 B. Get Access
 (1) Open the MLG doors (Ref. TASK 32-12-00-010-001).
 (2) Make sure that a GROUND LOCK SLEEVE is installed on each MLG door (Ref. TASK 32-00-00-481-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(97)