(3)
Make sure that the NLG doors are open (Ref. TASK 32-22-00-010-001).
(4)
Make sure that the access platform is in position below the applicable NLG door.
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-212,
(Ref. Fig. 405/TASK 32-22-11-991-010) R **ON A/C 106-149, 213-299, 301-399, 401-499,
(Ref. Fig. 405A/TASK 32-22-11-991-010-A)
**ON A/C ALL
Subtask 32-22-11-420-057
A. Installation of the Main Door Assy
(1)
Make sure that the bushes (9) and (11) are in the correct position.
(2)
Lubricate the bolts (6) and (10) with COMMON GREASE (Material No. 04-022).
(3)
Put the door (15) in position. Install the bolts (6) and (10).
(4)
Install the nuts (4) and (14) with the washers (5) and (12).
(5)
Tighten the nuts (4) and (14) and safety them with the new cotter pins (3) and the new cotter pin (13).
(6)
Install the bolts (8), the bonding braids (7) and the nuts (2). Tighten the nuts (2).
(7)
Connect the applicable NLG main-door control-rod CAUTION : CONNECT THE AFT ROD TO THE LEFT DOOR AND THE FWD ROD TO THE
_______ RIGHT DOOR. IF YOU CONNECT THE RODS TO THE WRONG DOORS, THE RODS WILL BECOME DAMAGED DURING OPERATION OF THE DOORS.
1EFF : ALL 1 32-22-11Page 434 1 1 Aug 01/05 1 1 1CES 1 NOTE : Do not change the adjustment of the control rod (1).
____
(a) Make sure that the bush (19) is in position.
R (b) Apply a thin layer of COMMON GREASE (Material No. 04-022) to the bolt (20).
(c)
Put the rod (1) in position.
(d)
Install the bolt (20), the washer (18) and the nut (16).
(e)
TORQUE the nut (16) to between 0.6 and 0.61 m.daN (53.09 and
53.98 lbf.in).
(f)
Make sure that the gap A is more than or equal to 1 mm (0.0393 in.).
(g)
If the gap A is correct, safety the nut (16) with the new cotter pin (17).
(h)
If the gap A is not correct: 1 Remove the nut (16) and the washer (18).
_
2 Remove the bolt (20) and disconnect the rod (1).
_
3 Remove the bush (19) and install the new bush (19).
_ R 4_Apply a thin layer of COMMON GREASE (Material No. 04-022) to the bolt (20). 5 Put the rod (1) in position.
_
6 Install the bolt (20), the washer (18) and the nut (16).
_
7 TORQUE the nut (16) to between 0.6 and 0.61 m.daN (53.09 and
_
53.98 lbf.in) and safety it with the cotter pin (17). 8 Apply a layer of SEALANTS (Material No. 09-013) to the head of
_ the bolt (20), the nut (16) and the washer (18).
1EFF : ALL 1 32-22-11Page 435 1 1 Feb 01/04 1 1 1CES 1 Subtask 32-22-11-410-055
B. Preparation for the Test
(1)
Lubricate the NLG doors (Ref. TASK 12-22-32-640-002).
(2)
Remove the access platform(s).
(3)
Close the NLG doors:
(a) Operate the NLG doors manually to make sure that there is no interference in the linkage.
(b) Close the NLG doors (Ref. TASK 32-22-00-410-001). Subtask 32-22-11-710-050
C. Operational Test
(1)
Do a full door close/door open cycle (Ref. TASK 32-22-00-010-001) and (Ref. TASK 32-22-00-410-001).
(2)
Make sure that the door operation is correct.
5. Close-up
________ Subtask 32-22-11-860-053
A. Put the aircraft back to its initial configuration.
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
1EFF : ALL 1 32-22-11Page 436 1 1 Aug 01/03 1 1 1CES 1 DOOR ASSY - AFT - REMOVAL/INSTALLATION
______________________________________
TASK 32-22-13-000-001
Removal of the Aft Door Assy
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
1. Reason for the Job
__________________
This procedure is only applicable when the aft door assy is removed for replacement. For the applicable procedure to remove the aft door assy for access only, Ref. TASK 32-22-13-010-001.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(9)