 Material No. 02-003  F NSA 307110 TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00)

 Material No. 02-003A  F NSA 307110 TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00)

 1EFF : ALL 1 32-31-12Page 406 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
R R  Material No. 02-003B Material No. 02-003C Material No. 02-003D  F NSA 307-110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)F NSA 307-110 TYPE IV HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00) F NSA 307-110 TYPE IV HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
6  seals  32-31-31 01 -140
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
R R R R  12-12-29-611-001 24-41-00-862-002 29-00-00-910-002 29-10-00-864-001 29-14-00-614-001 29-23-00-860-001 29-23-00-860-002 32-00-00-860-001 32-00-00-860-002 32-12-00-010-001 32-12-00-410-001 32-31-00-720-002 51-75-13-916-002  Fill the Hydraulic Fluid Reservoir with a Hand PumpDe-energize the Aircraft Electrical Circuits Supplied from the External PowerSafety Procedures of the Hydraulic SystemDepressurize the Green Hydraulic SystemDepressurization of the Hydraulic ReservoirsDisconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Connection of the Isolation Coupling of the Power Transfer Unit (PTU) Flight Configuration Precautions with Electrical Power Ground Configuration after Flight Configuration with Electrical PowerOpen the Main Gear Doors for AccessClose the Main Gear Doors after AccessFunctional Test of the Normal Extension and Retraction of the Landing GearRepair to a layer of Corrosion Preventive Compound

 1EFF : ALL 1 32-31-12Page 407 1 1 Feb 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


32-31-12-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 32-31-12-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).

 (2)
 Make sure that the electrical circuits are de-energized (Ref. TASK 24-41-00-862-002) or the flight configuration precautions were obeyed (Ref. TASK 32-00-00-860-001).

 (3)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).

 (4)
 Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system.

 (5)
 Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).


 Subtask 32-31-12-560-050
 B. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (4)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (5)
 Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new seals (6).


 1EFF : ALL 1 32-31-12Page 408 1 1 Feb 01/05R 1 1 1CES 1


 Subtask 32-31-12-865-052
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 4. Procedure
_________
 (Ref. Fig. 401/TASK 32-31-12-991-001)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(102)