• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
32-22-15-991-001  Fig. 401
 1EFF : ALL 1 32-22-15Page 409 1 1 May 01/05 1 1 1CES 1 1EFF : ALL 1 32-22-15Page 410 1 1 Feb 01/04 1 1 1CES 1 1EFF : ALL 1 32-22-15Page 411 1 1 Aug 01/99 1 1 1CES 1


 3. Job Set-up__________
 Subtask 32-22-15-860-052
 A. Safety Precautions
 (1) In the cockpit, make sure that the warning notice(s) is (are) in position to tell persons not to operate: - the landing gear control lever on the panel 400VU, - the steering handwheels (CAPT and F/O), - the brake pedals.
 (2) Make sure that the safety barriers are in position.
 4. Procedure_________
 (Ref. Fig. 401/TASK 32-22-15-991-001)
 Subtask 32-22-15-640-051
 A. Preparation before Installation
 (1) Do an inspection of the component interface and/or the adjacent area.
 (2) Clean the component interface and/or the adjacent area. 
R R  (3) Lubricate the bolts and nuts with COMMON GREASE (Material No. 04-004) or COMMON GREASE (Material No. 04-022). 
R R R R  NOTE : Do not mix Material No. 04-004 with Material No. 04-022. You____ can use Material No. 04-022 as an alternative to Material No. 04-004. Clean and degrease the parts before you use Material No. 04-022.
 Subtask 32-22-15-420-051
 B. Installation of the Leg Door Assy
 NOTE : Do not change the adjustment of the rod (11), the rod end of the____ fitting (2) and the rod ends of the support (10).
 (1) Put the fairing (6) in position.
 (2) Install the bushes (8) and the bolts (9).
 (3) Install the nuts (7), but do not fully tighten the nuts at this time.
 (4) Install the rod (11) on its link with the fairing (6) and install the bushes (3) and (4).
 (5) Install the end fitting (2), the bolt (1) with the nut (5).

 

R  (6) TORQUE the nut (5) to between 0.7 and 0.8 m.daN (61.94 and 70.79 
R  lbf.in). 
R  (7) Tighten the nuts (7). 
R  5. Close-up________ 
R  Subtask 32-22-15-860-053 
R  A. Put the aircraft back to its initial configuration. 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Remove the warning notice(s). 
R  (3) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items.

 

 ROD - ROTATING - REMOVAL/INSTALLATION
_____________________________________ TASK 32-22-16-000-001 Removal of the Rotating Rod WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY

_______ OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice(s)
 No specific access platform 1.7 m (5 ft. 7 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
07-11-00-581-003 Lifting of the Aircraft at Forward Jacking Point, MLG
 Wheels on the Ground 32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-30-00-867-001 Retraction of the Landing Gear for Maintenance 32-22-16-991-001 Fig. 401
 1EFF : ALL 1 32-22-16Page 401 1 1 Feb 01/98 1 1 1CES 1


 3. Job Set-up
__________ Subtask 32-22-16-941-050
 A. Safety Precautions
 (1) In the cockpit, on the panel 400VU, put warning notice(s) in position to tell persons not to operate the landing gear control lever.
 (2)
 Put the safety barriers in position. Subtask 32-22-16-010-051

 B. Get Access
 (1) Open the doors of the nose landing gear (Ref. TASK 32-22-00-010-001).

 (2)
 Put the access platform in position in zone 123. Subtask 32-22-16-860-050


 C. Aircraft Maintenance Configuration
 (1) Lift the aircraft with jack and lift the nose wheels off the ground (Ref. TASK 07-11-00-581-003).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(21)