On the ECAM Lower DU: 
-
the L/G (red) indicator lights go off
-
the message (amber) L/G CTL goes off
-
the message (amber) UPLOCK shows for each landing gear.
On the panel 402VU:
-
the L/G (red) indicator lights go off.
On the aircraft: 
-
the NLG and MLG door uplock hooks move to the open and unlocked position
-
the input levers of the cut-out valve and the vent valves move to the operated position
-
the NLG and MLG uplock hooks move to the open and unlocked position. If necessary, use a suitable (non metallic) tool to move the uplock hooks to the fully open position.
On the ECAM lower DU:
-
the message UPLOCK goes out of view
-
the landing gear symbols change to green triangles.
On the aircraft:
-
the free-fall mechanism on the NLG and MLG door and gear uplocks go back to the rigged position (system reset)
-
the input levers of the cut-out valve and the vent valves go back to the rigged position (system reset).
1EFF : ALL 1 32-31-00Page 513 1 1 Aug 01/01 1 1 1CES 1 1EFF : ALL 1 32-31-00Page 514 1 1 Aug 01/01 1 1 1CES 1 1EFF : ALL 1 32-31-00Page 515 1 1 Aug 01/01 1 1 1CES 1 **ON A/C 001-049, 101-149, 151-199, 201-299,
R  Subtask 32-31-00-860-103  
R  C. Aircraft Maintenance Configuration  
R  (1) Do the EIS stop procedure  
R  (Ref. TASK 31-60-00-860-002).  
R  (2) De-energize the aircraft electrical circuits  
R  (Ref. TASK 24-41-00-862-002).  
R  Subtask 32-31-00-080-065  
R  D. Test Equipment Removal  
R  (1) Disconnect the L.G. SIMULATOR TEST BOX and the MLG SIMULATOR HARNESS  
R  from the applicable MLG harness interface as follows:  
R  (a) Disconnect the cable connectors of the test harness from:  
R  - the MLG harness interface 1M and 2M  
R  - the simulation test box.  
R  (2) Disconnect the L.G. SIMULATOR TEST BOX and the NLG SIMULATOR HARNESS  
R  from the applicable NLG harness interface as follows:  
R  (a) Disconnect the cable connectors of the test harness from:  
R  - the NLG harness interface 1M and 2M  
R  - the simulation test box.  
R  (3) Connect the MLG harness 1M as follows:  
R  (Ref. Fig. 501/TASK 32-31-00-991-020)  
R  (a) Remove the blanking caps from the electrical connectors.  
R  (b) Make sure that the electrical connectors are clean and in the  
R  correct condition.  
R  (c) Connect the electrical connector (2) to 4027VC (4028VC) and make  
R  sure that the route of the harness 1M (4) is correct. Put the  
R  cleat (6) in position and install the screw (5).  
R  (d) Put the lid (3) in position and install the screws (1).  
R  (4) Connect the MLG harness 2M as follows:  
R  (Ref. Fig. 502/TASK 32-31-00-991-021)  
R  (a) Remove the blanking caps from the electrical connectors.
R  (b) Make sure that the electrical connectors are clean and in the  
R  correct condition.  
R  (c) Connect the electrical connector (1) to 4029VC (4030VC).  
R  (5) Connect the NLG harness 1M as follows:  
R  (Ref. Fig. 503/TASK 32-31-00-991-022)  
R  (a) Remove the blanking caps from the electrical connectors.  
R  (b) Make sure that the electrical connectors are clean and in the  
R  correct condition.  
R  (c) Connect the electrical connector (1) to 1300VCA.  
R  (6) Connect the NLG harness 2M as follows:  
R  (Ref. Fig. 504/TASK 32-31-00-991-023)  
R  (a) Remove the blanking caps from the electrical connectors.  
R  (b) Make sure that the electrical connectors are clean and in the  
R  correct condition.  
R  (c) Connect the electrical connector (1) to 1302VCA.  
R  5. Close-up________  
R  Subtask 32-31-00-410-073  
R  A. Close Access  
R  (1) Make sure that the work area is clean and clear of tool(s) and other  
R  items.  
R  (2) Close the applicable access panel 574AB (674AB).  
R  (3) Remove the access platform(s).  
R  Subtask 32-31-00-740-051  
R  B. Bite Test  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn