1EFF : ALL 1 32-31-17Page 409 1 1 Aug 01/05 1 1 1CES 1
(4)
Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).
(5)
Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
Subtask 32-31-17-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
Subtask 32-31-17-860-052
C. Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system.
Subtask 32-31-17-560-050-A
D. Preparation for Installation
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(4)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(a) Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new packings (2).
1EFF : ALL 1 32-31-17Page 410 1 1 Aug 01/05R 1 1 1CES 1
(b)
Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) and the new packing (16).
(c)
Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new back-up rings (3).
(d)
Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new back-up ring (15).
(5)
If removed apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new square seals (6).
(a)
Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new square seal (12).
(b)
Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new back-up rings (5).
(c)
Applly HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new back-up ring (13).
(6)
Install the back-up rings (5) and (13) on the bobbins (4) and (14), install the square seals (6) and (12) on the bobbings (4) and (14) and install the bobbins (Ref. TASK 20-23-21-911-001).
4. Procedure
_________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
(Ref. Fig. 401/TASK 32-31-17-991-001-A)
1EFF : ALL 1 32-31-17Page 411 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 401-499,
R (Ref. Fig. 401A/TASK 32-31-17-991-001) R **ON A/C ALL
Subtask 32-31-17-420-050-A
A. Installation of the Safety Valve (7)
(1)
Remove the blanking plugs.
(2)
Install the new back-up rings (3) and (15) on the bobbins (4) and (14).
(3)
Install the new packings (2) and (16) on the bobbins (4) and (14) (Ref. TASK 20-23-21-911-001).