• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R R  (2) Connect the electrical connector (5) to the contactor 3XG connection (4). 
R R R  (3) Disconnect and remove the ADAPTER COVER-STATIC PORT equipment from the static probes 7DA2 and 8DA2, and the GROUND PRESSURE GENERATOR. 

R 1EFF : ALL 1 32-31-00Page 564 1 1 May 01/05 1 1 1CES 1 1EFF : ALL 1 32-31-00Page 565 1 1 May 01/05 1 1 1CES 1


R R  (4) Disconnect and remove the ADAPTOR-CHARGING,PITOT PROBE from the pitot probe 9DA2 and the GROUND PRESSURE GENERATOR. 
R R  (5) Remove the colored adhesive tape from the pitot probe 9DA2 drain holes and the AOA sensor 3FP2.
 Subtask 32-31-00-410-072
 C. Close Access
 (1) Make sure that the applicable MLG ground door-operating handle is locked in the CLOSED position.
 (2) Make sure that the work area is clean and clear of tool(s) and other items.
 (3) Install the access panel (1) below the panel 123VU.
 (4) Install the third occupant seat (Ref. TASK 25-11-41-400-001).
 (5) Close the applicable quick-release access panel 195BB, 196BB.
 Subtask 32-31-00-865-108
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 7XE.
 Subtask 32-31-00-869-112
 E. Flight Configuration Precautions
 (1) Put the aircraft back to the ground configuration (Ref. TASK 32-00-00-860-002). 
R  **ON A/C 001-049, 051-061, 101-105, 201-203,
 Subtask 32-31-00-942-091
 F. Removal of Equipment
 (1) Remove the SAFETY DEVICE - RAT (Ref. TASK 29-22-00-860-002).
 (2) Remove the safety barriers.

 

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (4)
 Remove the warning notice(s).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 32-31-00-942-091-A
 F. Removal of Equipment
 (1)
 Remove the SAFETY DEVICE - RAT (Ref. TASK 29-22-00-860-008).

 (2)
 Remove the safety barriers.

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (4)
 Remove the warning notice(s).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-31-00Page 566 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-105, 151-158, 201-210,


 TASK 32-31-00-710-008
 Operational Check to Ensure Safety Valve Closure
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 323100-07
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific safety barriers
 No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)
 460005835 1 GROUND LOCK SLEEVE

R 1EFF : 001-049, 051-099, 101-105, 151-158, 1 32-31-00Page 567 1201-210, 1May 01/05 1 1 1CES 1 B. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R  24-41-00-861-002 24-41-00-862-002 29-10-00-863-001 29-10-00-864-001 29-23-00-860-001 29-23-00-860-002 29-23-00-863-001 29-23-00-864-001 32-00-00-481-001 32-00-00-860-001 32-00-00-860-002 32-12-00-010-001 32-12-00-410-001 32-31-17-000-001 32-31-17-400-001 32-31-00-991-024  Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External PowerPressurize the Green Hydraulic SystemDepressurize the Green Hydraulic SystemDisconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Connection of the Isolation Coupling of the Power Transfer Unit (PTU) Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTUInstallation of the Safety Devices on the Landing GearsFlight Configuration Precautions with Electrical PowerGround Configuration after Flight Configuration with Electrical PowerOpen the Main Gear Doors for AccessClose the Main Gear Doors after AccessRemoval of the Landing Gear Safety-ValveInstallation of the Landing Gear Safety-Valve Fig. 507
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(76)