Material No. 02-003A F NSA 307110 TYPE 4
HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
1EFF : ALL 1 32-31-34Page 406 1 1 May 01/05 1 1 1CES 1 1EFF : ALL 1 32-31-34Page 407 1 1 Feb 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R R Material No. 02-003B Material No. 02-003C Material No. 02-003D F NSA 307-110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)F NSA 307-110 TYPE IV HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00) F NSA 307-110 TYPE IV HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
6 seals 32-31-31 01 -140
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R R R R 12-12-29-611-001 24-41-00-862-002 29-00-00-910-002 29-10-00-864-001 29-14-00-614-001 29-23-00-860-001 29-23-00-860-002 32-00-00-860-001 32-00-00-860-002 32-12-00-010-001 32-12-00-410-001 32-31-00-710-002 32-31-00-720-002 51-75-13-916-002 32-31-34-991-001 Fill the Hydraulic Fluid Reservoir with a Hand PumpDe-energize the Aircraft Electrical Circuits Supplied from the External PowerSafety Procedures of the Hydraulic SystemDepressurize the Green Hydraulic SystemDepressurization of the Hydraulic ReservoirsDisconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Connection of the Isolation Coupling of the Power Transfer Unit (PTU) Flight Configuration Precautions with Electrical Power Ground Configuration after Flight Configuration with Electrical PowerOpen the Main Gear Doors for AccessClose the Main Gear Doors after AccessOperational Test of the Landing Gear DoorsFunctional Test of the Normal Extension and Retraction of the Landing GearRepair to a layer of Corrosion Preventive CompoundFig. 401
3. Job Set-up
__________
Subtask 32-31-34-860-052
A. Aircraft Maintenance Configuration
(1)
Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).
(2)
Make sure that the aircraft electrical circuits are de-energized (Ref. TASK 24-41-00-862-002)
(3)
Make sure that the flight configuration precautions were obeyed (Ref. TASK 32-00-00-860-001).
(4)
Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).
(5)
Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
Subtask 32-31-34-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R 49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
Subtask 32-31-34-941-052
C. Safety Precautions
(1) Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system.
1EFF : ALL 1 32-31-34Page 408 1 1 Feb 01/99 1 1 1CES 1 1EFF : ALL 1 32-31-34Page 409 1 1 Nov 01/99 1 1 1CES 1
Subtask 32-31-34-860-051
D. Preparation for Installation
(1) Clean the component interface and/or the adjacent area.
(2) Do an inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(151)