 (2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
 (8.00 to 75.00 lbf.ft)
 1EFF : ALL 1 32-31-36Page 406 1 1 Feb 01/98 1 1 1CES 1


 B. Consumable Materials -------------------------------------------------------------------------------
REFERENCE ------------------ DESIGNATION-------------------------------------------------------------
R  Material No. 02-003  F  NSA 307110  TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00) 
R  Material No. 02-003A  F  NSA 307110  TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00) 
R  Material No. 02-003B  F  NSA 307-110  TYPE 4
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00)
 Material No. 02-003C  F  NSA 307-110  TYPE IV
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00) 
R  Material No. 02-003D  F  NSA 307-110  TYPE IV
 HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
 (Ref. 20-31-00)
 C. Expendable Parts
 ---------FIG.ITEM --------- ---------------------------------|DESIGNATION --------------------------------- -------------------------------------|IPC-CSN-------------------------------------
5  packing  32-31-03 10A-220
 5  packing  32-31-03 10B-220
 12  packing  32-31-03 15A-040
 D. Referenced Information
 ------------------REFERENCE  -------------------------------------------------------------DESIGNATION

 -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 29-23-00-860-002 Connection of the Isolation Coupling of the Power
 Transfer Unit (PTU) R 32-00-00-860-001 Flight Configuration Precautions with Electrical R Power R 32-00-00-860-002 Ground Configuration after Flight Configuration with R Electrical Power
 1EFF : ALL 1 32-31-36Page 407 1 1 Feb 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access 32-31-00-720-002 Functional Test of the Normal Extension and
 Retraction of the Landing Gear 51-75-13-916-002 Repair to a layer of Corrosion Preventive Compound 32-31-36-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 32-31-36-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).

 (2)
 Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002)

 (3)
 Make sure that the flight configuration precautions were obeyed (Ref. TASK 32-00-00-860-001).

 (4)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).

 (5)
 Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).


 Subtask 32-31-36-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 1EFF : ALL 1 32-31-36Page 408 1 1 May 01/00R 1 1 1CES 1


 Subtask 32-31-36-941-051
 C. Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system.
 Subtask 32-31-36-560-050
 D. Preparation for Installation
 (1) Preparation of the check valve 2519GM.
 (a) Remove the blanking plugs. 
R R R R  (b) Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the threads of the check valve (13). 
 