1EFF : ALL 1 32-31-19Page 407 1 1 Feb 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
51-75-13-916-002 Repair to a layer of Corrosion Preventive Compound 32-31-19-991-001-A Fig. 401
 3. Job Set-up
__________
 Subtask 32-31-19-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).
 (2)
 Make sure that the aircraft electrical circuits are de-energized (Ref. TASK 24-41-00-862-002) or the flight configuration precautions were obeyed (Ref. TASK 32-00-00-860-001).
 (3)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).
 (4)
 Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
 (5)
 Make sure that the warning notices are in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground panel of the Green hydraulic system.
 Subtask 32-31-19-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 1EFF : ALL 1 32-31-19Page 408 1 1 Feb 01/05R 1 1 1CES 1
 Subtask 32-31-19-560-050-A
 C. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area.
 (2)
 Do an inspection of the component interface and/or the adjacent area.
 (3)
 Make sure that the parts retained from the removed component are clean and in the correct condition.
 (4)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
 (5)
 Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new packings (6) and the new back-up rings (5).
 (6)
 If removed apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to the new seals (2) and the new back-up rings (3).
 4. Procedure
_________
 Subtask 32-31-19-420-051-A
 A. Installation of the Valves (1) and (7) on the Manifold Assy (8) (Ref. Fig. 401/TASK 32-31-19-991-001-A)
 (1) Remove the blanking plugs.
 (2) If removed install the new back-up rings (3) and the new seals (2) on R the bobbins (4) and install the bobbins (4) in the manifold (8) R (Ref. TASK 20-23-21-911-001).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(125)