1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
No specific warning notices
No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
(8.00 to 75.00 lbf.ft) No specific Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft) R 98DNSA20208060 2 RIGGING PIN
1EFF : ALL 1 32-31-44Page 409 1 1 Nov 01/01 1 1 1CES 1 B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 07-010 D DA-4-653-91 LACQUER OBSOLETE USE 16-047 (Ref. 20-31-00)
Material No. 19-010 USA AMS 5687
LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3 cotter pin 32-31-03 22 -120 15 cotter pin 32-31-03 22 -260A 28 cotter pin 32-31-03 22 -260A 32 cotter pin 32-31-03 22 -060 38 cotter pin 32-33-03 01 -170
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU) 29-23-00-860-002 Connection of the Isolation Coupling of the Power
Transfer Unit (PTU) R 32-00-00-860-001 Flight Configuration Precautions with Electrical R Power
1EFF : ALL 1 32-31-44Page 410 1 1 May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 32-00-00-860-002 Ground Configuration after Flight Configuration with
R Electrical Power 32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access 32-31-00-720-002 Functional Test of the Normal Extension and
Retraction of the Landing Gear 32-33-00-720-001 Functional Check of Free-Fall Extension 51-75-13-916-002 Repair to a layer of Corrosion Preventive Compound 32-31-44-991-001 Fig. 401 32-31-44-991-002 Fig. 402
3. Job Set-up
__________
Subtask 32-31-44-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).
(2)
Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002)
(3)
Make sure that the flight configuration precautions were obeyed (Ref. TASK 32-00-00-860-001).
(4)
Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).
(5)
Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
Subtask 32-31-44-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged