R  (3) Application of special materials:
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (a) Apply SPECIAL MATERIALS (Material No. 05-002) to the splines of the shaft (17) and the splines of the bypass-levers (7) and (26).
 (b) Apply SPECIAL MATERIALS (Material No. 05-002) to the bolts (6) and (21), the washers (16) and (20) and the nuts (14) and (19).
R  (4) Align the master splines of the bypass-levers (7) and (26) and install them in the correct position on the shaft (17): 
R R  (a) Install the bypass-lever (7) with the bolt (6), the washer (16) and the nut (14). 
R R  (b) Install the bypass-lever (26) with the bolt (21), the washer (20) and the nut (19).
 (5) Safety the nut (14) with a new cotter pin (15) and the nut (19) with a new cotter pin (22).
 (6) Apply STORAGE PRESERVATION (Material No. 15-007) to the nuts (14) and (19) and the ends of the bolts (6) and (21).
 (7) Lubricate the new packings (3) with HYDRAULIC FLUIDS (Material No. 02-003).
 (8) Install the packings (3) on the unions (2).
 (9) Remove the blanking plugs from the bypass-valve (4) and install the unions (2). 
R R  (10) TORQUE the unions (2) to between 1.763 and 1.877 m.daN (13.00 and 13.84 lbf.ft).
 (11) Apply SPECIAL MATERIALS (Material No. 05-002) to the thread of the unions (2).

 

 Subtask 32-31-13-420-052 
R R B. Preparation for Installation 
R R  (1) Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
 (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
 (3) Do an inspection of the component interface and/or the adjacent area.
 Subtask 32-31-13-420-050
 C. Installation of the MLG Door Ground-Opening Bypass-Valve
 (1) Apply SPECIAL MATERIALS (Material No. 05-002)to the bolts (5) and the nuts (18).
 (2) Put the bypass-valve (4) in position and install it with the bolts (5) and the nuts (18).
 (3) Remove the blanking caps and connect the end-fittings (1) on the unions (2).
 NOTE : The bypass lever (7) to the control rod (11) and the bypass____ lever (26) to the flexible control rod (29) are connected during the Preparation for Test.
 Subtask 32-31-13-820-050
 D. Adjustment of the Door Ground-Opening System
 (1) Do the rigging and complete the installation of the MLG door ground-opening system (Ref. TASK 32-12-00-820-001).
 Subtask 32-31-13-860-054
 E. Preparation for Test
 (1) Pressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
 (2) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 

 F. Test
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Do an operational test of the applicable MLG door (Ref. TASK 32-31-00-710-002).

 (3)
 Make sure that there is no leakage of hydraulic fluid from the bypass-valve.


 5. Close-up
________ Subtask 32-31-13-942-050
 A. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-31-13Page 411 1 1 Aug 01/04R 1 1 1CES 1


 UPLOCK ASSY - NLG DOOR (2534GM) - REMOVAL/INSTALLATION
______________________________________________________
 TASK 32-31-14-000-001
 Removal of the NLG Door Uplock Assy (2534GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 