1EFF : ALL 1 32-31-14Page 421 1 1 Feb 01/04 1 1 1CES 1 1EFF : ALL 1 32-31-14Page 422 1 1 Feb 01/04 1 1 1CES 1
R Subtask 32-31-14-720-051
R F. Functional Test
R (1) Do an operational test of the landing gear doors (Ref. TASK 32-31-00-
R 710-002).
R (2) Open the NLG doors (Ref. TASK 32-22-00-010-001).
R (3) Put the access platform in position below the NLG door uplock assy
R (2534GM).
R (4) Make sure that there is no hydraulic fluid leakage from the NLG door
R uplock assy (2534GM).
R (5) If necessary fill the reservoir of the Green hydraulic system to the
R correct level (Ref. TASK 12-12-29-611-001).
R 5. Close-up________
R Subtask 32-31-14-410-052
R A. Close Access
R (1) Remove the warning notice(s).
R (2) Remove the access platform(s).
R (3) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (4) Close the doors of the nose landing gear (Ref. TASK 32-22-00-410-
R 001).
R R Actuator of the NLG Uplock Assy Figure 402/TASK 32-31-14-991-003
1EFF : 1 1 1CES ALL 1 111 32-31-14 Page 423 Feb 01/04
BYPASS VALVE - NLG DOOR GROUND OPENING (2533GM) - REMOVAL/INSTALLATION
______________________________________________________________________ TASK 32-31-15-000-001 Removal of the NLG Door Ground Opening Bypass Valve (2533GM) WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
No specific safety barriers
No specific warning notice(s)
No specific access platform 2.06 m (6 ft. 9 in.)
No specific container 5 l (1.3208 USgal)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-31-15-991-001 Fig. 401
1EFF : ALL 1 32-31-15Page 401 1 1 Feb 01/98 1 1 1CES 1
3. Job Set-up
__________ Subtask 32-31-15-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001)
(2)
Depressurize the reservoir of the Green hydraulic system. (Ref. TASK 29-14-00-614-001)
Subtask 32-31-15-010-050
B. Get Access
(1) Open the doors of the nose landing gear (Ref. TASK 32-22-00-010-001).
(2) Put the access platform in position in zone 123. Subtask 32-31-15-941-050
C. Safety Precautions
(1)
In the cockpit, on the panel 400VU, put warning notice(s) in position to tell persons not to operate the landing gear control lever.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(113)