• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)
 Remove and discard the lockwasher (2).

 (4)
 Remove the washer (3) and the bolt (6) with the washer (7).

 (5)
 Disconnect the rod end (8) from the lever (5).

 (6)
 Remove the cotter pin (12) and discard it, remove the nut (13) and the washer (14).

 (7)
 Remove the bolt (10) and disconnect the actuating cylinder from the support (16).

 (8)
 Remove the actuating cylinder (17).


 1EFF : ALL 1 32-31-16Page 403 1 1 Feb 01/98 1 1 1CES 1


 NLG Door Actuating Cylinder
 Figure 401/TASK 32-31-16-991-001
 1EFF :  ALL  1  32-31-16 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 32-31-16-400-001
 Installation of the NLG Door Actuating Cylinder (2531GM)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice(s)
 No specific access platform 2.06 m (6 ft. 9 in.)
 No specific container 5 l (1.3208 USgal)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft) 98D32303000000 1 ADAPTER-WRENCH
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-004  USA MIL-PRF-23827 TYPE I
 SYNTH.ESTER BASED GREASE HIGH PRESSURE
 (Ref. 20-31-00)

R Material No. 04-022 USA MIL-PRF-81322 GRADE 2 R SYNTHE.HYDROCARBON GREASE HIGH PRESSURE R (Ref. 20-31-00)
 Material No. 11-002  USA MIL-PRF-680
 DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT)
 (Ref. 20-31-00)

 1EFF : ALL 1 32-31-16Page 405 1 1 Feb 01/04 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
2  lockwasher  32-31-01 03 -070
 12  cotter pin  32-31-01 03 -010
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic
 Service Cart 12-22-32-640-002 Lubrication of the NLG and Doors 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-22-00-410-001 Nose Gear Doors - Ground Doors Closing 32-31-16-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 32-31-16-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001)

 (2)
 Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).

 (3)
 In the cockpit, on the panel 400VU, make sure that the warning notice(s) is (are) in position to tell persons not to operate the landing gear control lever.


 1EFF : ALL 1 32-31-16Page 406 1 1 Feb 01/04R 1 1 1CES 1


 (4) Make sure that the warning notice(s) is (are) in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system, access door (197CB).
 (5) Make sure that the safety barriers are in position.
 (6) Make sure that the container is in position below the NLG door actuating cylinder (2531GM).
 (7) Make sure that the doors of the nose landing gear are open (Ref. TASK 32-22-00-010-001).
 (8) Make sure that the access platform is in position in zone 123.
 4. Procedure_________
 (Ref. Fig. 401/TASK 32-31-16-991-001)
 Subtask 32-31-16-110-050
 A. Preparation for Installation
 (1) Clean the junction components with CLEANING AGENTS (Material No. 11-002) and dry with dry, filtered compressed air. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架4(117)