R  Subtask 32-31-00-865-109  
R  D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and  
R  tagged  
R  ------------------------------------------------------------------------------- 
R  PANEL DESIGNATION IDENT. LOCATION  
R  ------------------------------------------------------------------------------- 
R  49VU L/G/LGCIU/SYS1/NORM 1GA C09  
R  121VU HYDRAULIC/LGCIU/SYS2 2GA Q35  
R  121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34  
R  Subtask 32-31-00-860-104  
R  E. Aircraft Maintenance Configuration  
R  (1) Use external power to energize the aircraft electrical circuits  
R  (Ref. TASK 24-41-00-861-002).  
R  Subtask 32-31-00-010-079  
R  F. Get Access  
R  (1) Make sure that the NLG doors are open (Ref. TASK 32-22-00-010-001).  
R  (2) Make sure that a SAFETY PIN - NLG DOOR (98D32203502000) is installed  
R  in each NLG door (Ref. TASK 32-00-00-481-002).  
R  (3) Make sure that the MLG doors are open (Ref. TASK 32-12-00-010-001).  
R  (4) Make sure that a GROUND LOCK SLEEVE (460005835) is installed on each  
R  MLG door actuating cylinder (Ref. TASK 32-00-00-481-002).  
R  (5) Put the access platform in position adjacent to the applicable MLG,  
R  below the zone 730 or 740.  
R  (6) Open the applicable access panel 574AB (674AB).  
R  Subtask 32-31-00-480-068  
R  G. Test Equipment Installation  
R  (1) Disconnect the electrical connector of the MLG harness 1M, as  
R  follows:  
R  (Ref. Fig. 501/TASK 32-31-00-991-020)  
R  (a) Remove the screws (1) and lower the lid (3) on the lanyards.
R  (b) Remove the screw (5) and the cleat (6).  
R  (c) Disconnect the electrical connector (2) from 4027VC (4028VC) and  
R  remove the MLG harness 1M (4) from the box.  
R  (d) Put blanking caps on the disconnected electrical connector (2) of  
R  the MLG harness 1M (4).  
R  (2) Disconnect the electrical connector of the MLG harness 2M, as  
R  follows:  
R  (Ref. Fig. 502/TASK 32-31-00-991-021)  
R  (a) Disconnect the electrical connector (1) from 4029VC (4030VC).  
R  (b) Put blanking caps on the disconnected electrical connector (1) of  
R  the MLG harness 2M.  
R  (3) Connect the L.G. SIMULATOR TEST BOX (99D32104085000) with the MLG  
R  SIMULATOR HARNESS (99D32104087000) to the applicable MLG harness  
R  interface as follows:  
R  (a) Connect the cable connectors of the test harness to:  
R  - the applicable electrical connectors of the MLG harness  
R  interface 1M and 2M  
R  - the simulation test box.  
R  (4) Disconnect the electrical connector of the NLG harness 1M, as  
R  follows:  
R  (Ref. Fig. 503/TASK 32-31-00-991-022)  
R  (a) Disconnect the electrical connector (1) from 1300VCA.  
R  (b) Put blanking caps on the disconnected electrical connector (1) of  
R  the NLG harness 1M.  
R  (5) Disconnect the electrical connector of the NLG harness 2M, as  
R  follows:  
R  (Ref. Fig. 504/TASK 32-31-00-991-023)  
R  (a) Disconnect the electrical connector (1) from 1302VCA.  
R  (b) Put blanking caps on the disconnected electrical connector (1) of  
R  the NLG harness 2M.
R  (6) Connect the L.G. SIMULATOR TEST BOX (99D32104085000) with the NLG  
R  SIMULATOR HARNESS (99D32104086000) to the applicable NLG harness  
R  interface as follows:  
R  (a) Connect the cable connectors of the test harness to:  
R  - the applicable electrical connectors of the NLG harness  
R  interface 1M and 2M  
R  - the simulation test box.  
R  Subtask 32-31-00-865-110  
R  H. Remove the safety clip(s) and the tag(s) and close this(these) circuit  
R  breaker(s):  
R  ------------------------------------------------------------------------------- 
 