• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:49来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Material No. 19-003  USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-16-41Page 405 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
1  O-ring  28-16-05 10A-310
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-25-00-650-001 Pressure Defuel 28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the
 Center Tank 28-25-00-869-001 Fuel Transfer 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
 28-16-41-991-001  Fig. 401
 3. Job Set-up
__________
 Subtask 28-16-41-941-053
 A. Safety Precautions
 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Make sure that the safety barriers are in position.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-16-41Page 406 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-16-41-860-051


 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001) .

 (2)
 Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

 (3)
 Make sure that the access platform is below the applicable zone 540(640).

 (4)
 Make sure that the applicable access panel is removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):

 -
FOR 124QM
 540MB


 -
FOR 125QM
 640MB.

 

 

 4. Procedure
_________
 (Ref. Fig. 401/TASK 28-16-41-991-001)
 Subtask 28-16-41-420-051
 A. Preparation for Installation
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1)
 Clean the component interfaces and the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-004).

 (2)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (3)
 Do an inspection of the component interface and/or the adjacent area.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-16-41Page 407 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (4) Lubricate the new O-ring (1) with FUELS (Material No. 01-001) or COMMON GREASE (Material No. 04-012).
 Subtask 28-16-41-420-050
 B. Installation of the Pressure Holding Valve 124QM(125QM)
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1)
 Install the O-ring (1) on the pressure holding valve (3) and hold them against the connector.

 (2)
 Install the bolts (2).

 (3)
 Apply SEALANTS (Material No. 09-007) to the bolt heads (2) and the anchor nuts.


 5. Close-up
________
 Subtask 28-16-41-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the applicable access panel (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-400-002):
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(84)