(2)
Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-25-00-650-003).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-41Page 608 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-12-41-010-050
C. Get Access
(1)
Put the access platform below the applicable zone 540(640).
(2)
Remove the applicable access panels (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):
-
FOR 102QM
remove the access panel 540JB and 540KB
-
FOR 103QM
remove the access panel 640JB and 640KB.
4. Procedure
_________
(Ref. Fig. 601/TASK 28-12-41-991-001)
Subtask 28-12-41-210-050
A. Inspection of the Overpressure Protector 102QM(103QM)
CAUTION : DO NOT APPLY PRESSURE TO THE SAFETY DISC BECAUSE IT WILL EASILY
_______
BREAK.
(1) Examine the overpressure protector (9) to make sure that:
-
there is no damage to the wire mesh (7)
-
there is no damage to the safety disc (8)
-the sealant on the nuts (6) and the heads of the bolts (10) is in the correct condition
-
there is no damage to the wire mesh basket (11)
-
there is no corrosion.
5. Close-up
________
Subtask 28-12-41-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the applicable access panels (Ref. TASK 28-10-00-910-002) (Ref. TASK 57-27-11-400-002):
-
FOR 102QM
install the access panel 540JB and 540KB
-
FOR 103QM
install the access panel 640JB and 640KB.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-41Page 609 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-12-41-650-053
B. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).
Subtask 28-12-41-942-050
C. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-41Page 610 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C ALL
TASK 28-12-41-200-002
Inspection of the Overpressure Protector 96QM
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
No specific warning notice
No specific access platform 2.0 m (6 ft. 7 in.)
No specific access platform 2.5 m (8 ft. 2 in.)
98D57004014000 1 HOOK-COVER (RIB2-SURGE DOORS)
1EFF : ALL 1 28-12-41Page 611 1 1 May 01/04 1 1 1CES 1 B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control
28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the
Center Tank
28-25-00-869-001 Fuel Transfer
32-12-00-010-001 Open the Main Gear Doors for Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(6)