(4)
Apply COMMON GREASE (Material No. 04-023) to the new O-ring (6).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-51Page 407 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-15-51-420-050
B. Installation of the Actuator 9QP(10QP)
CAUTION : MAKE SURE THAT YOU ASSEMBLE THE ACTUATOR WITH THE DRIVE
_______ ASSEMBLY CORRECTLY. IF YOU DO NOT, THE ACTUATOR WILL NOT OPERATE THE VALVE CORRECTLY.
(1)
Make sure the transfer-valve drive-slot moves freely.
(2)
Align the transfer-valve drive-slot with the transfer valve actuator (5).
(3)
Install the new O-ring (6) on the transfer valve drive (1).
(4)
Carefully install the transfer valve actuator (5) and the clamp (3). NOTE : Make sure that the mating surfaces of the actuator (5) and the
____ transfer-valve drive (1), engage correctly before you install the clamp (3).
(5)
Install the bolt (2).
(6)
TORQUE the bolt (2) to between 0.102 and 0.113 m.daN (9.02 and 9.99 lbf.in).
(7) Remove the blanking caps and install the electrical connector (4). Subtask 28-15-51-865-053
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1QP, 2QP, 3QP, 4QP.
Subtask 28-15-51-710-050
D. Operational Test
(1) Do a BITE of the intercell transfer valves (Ref. TASK 28-15-00-740-002).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-51Page 408 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
5. Close-up
________ Subtask 28-15-51-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel:
-
FOR 9QP
install 522KB
-
FOR 10QP
install 622KB.
Subtask 28-15-51-942-051
B. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-51Page 409 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-15-51-000-002
Removal of the Actuator 11QP(12QP)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
-
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
-
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
-MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific warning notice No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground 27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance 28-15-51-991-001 Fig. 401
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-51Page 410 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
3. Job Set-up
__________
(Ref. Fig. 401/TASK 28-15-51-991-001) Subtask 28-15-51-941-051
A. Safety Precautions
(1)
Put the safety barriers in position.
(2)
Put a warning notice in position to tell persons not to operate the flight controls.
Subtask 28-15-51-010-055
B. Get Access
(1)
Extend the flaps fully (Ref. TASK 27-50-00-866-008).