 28-25-00-650-001 Pressure Defuel
 28-25-00-869-001 Fuel Transfer

 1EFF : ALL 1 28-12-46Page 407 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------


REFERENCE DESIGNATION
 -------------------------------------------------------------------------------

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 28-12-46-991-002 Fig. 401
 **ON A/C 301-399,
 28-12-46-991-002-A Fig. 401A
 **ON A/C ALL
 28-12-46-991-003 Fig. 402
 3. Job Set-up
__________
 Subtask 28-12-46-941-054

 A. Safety Precautions
 WARNING : OBEY THE FUEL SAFETY PROCEDURES.

_______
 (1) You must obey the fuel safety procedures when you do work on the fuel system (Ref. TASK 28-00-00-910-001)
 (2) Make sure that the safety barriers are in position.
 Subtask 28-12-46-860-052

 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).

 (2)
 Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (3)
 Make sure that the access platform is below the applicable zone 540(640).


 1EFF : ALL 1 28-12-46Page 408 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 28-12-46Page 409 1 1 Aug 01/05 1 1 1CES 1


 4. Procedure_________ 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 401/TASK 28-12-46-991-002)
 **ON A/C 301-399,
 (Ref. Fig. 401A/TASK 28-12-46-991-002-A)
 **ON A/C ALL
 (Ref. Fig. 402/TASK 28-12-46-991-003) 
R  Subtask 28-12-46-420-052-A 
R  A. Preparation for Installation 
R  (1) Examine the sealing ring (2) for damage. If necessary, remove and 
R  discard it. 
R  (2) Install the new sealing ring (2): 
R  (a) Remove the used sealant from the groove in the access panel (3) 
R  with a non-metalic scraper. 
R  (b) Clean the groove in the access panel (3) with a MISCELLANEOUS 
R  (Material No. 19-003) made moist with CLEANING AGENTS (Material 
R  No. 11-026) 
R  (c) Apply a thin layer of SEALANTS (Material No. 09-007) to the 
R  groove in the access panel (3). 
R  (d) While the sealant is wet, put the new sealing ring (2), with the 
R  flat edge down, into the groove in the access panel (3). 
R  (3) Clean the component interface and the adjacent areas with a 
R  MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS 
R  (Material No. 11-004). 
R  (4) Do an inspection of the component interface and/or the adjacent area. 
R  (5) Remove the protective cover from the pressure relief outlet (1).

 

 Into and Out-of-Wind Dimensions Figure 402/TASK 28-12-46-991-003
 1EFF : 1 1R 1CES  ALL  1 11 1 28-12-46 Page 410 May 01/05

 

R R R  (6) Apply a thin layer of SPECIAL MATERIALS (Material No. 05-002) to the bolts (4). Apply to the shank, the threads and below the head of each bolt (4). 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 28-12-46-420-050
 B. Installation of the Overpressure-Protector Outlet
 (1) Make sure that all of the bonding straps are correctly installed and attached (Ref. TASK 20-28-00-912-002), before you install the access panel 540HB(640HB).
 (2) Apply STORAGE PRESERVATION (Material No. 15-004) to the fastener bolt (4) holes.
 (3) Put the access panel (3) in position.
 CAUTION : YOU MUST REMOVE AND INSTALL THE BOLTS IN THE SPECIFIED_______ SEQUENCE. THIS WILL PREVENT DAMAGE TO THE ACCESS PANEL.
 (4) Install the bolts (4) and TORQUE in the sequence A thru AB, in two steps, to these values:
 (a) Firstly to between 25 and 30 lbf.in (0.28 and 0.33 m.daN).
 (b) Secondly to between 140 and 160 lbf.in (1.58 and 1.80 m.daN).
 **ON A/C 301-399,
 Subtask 28-12-46-420-050-A
 B. Installation of the Overpressure-Protector Outlet
 (1) Make sure that all of the bonding straps are correctly installed and attached (Ref. TASK 20-28-00-912-002), before you install the access panel 540PB(640PB).
 (2) Apply STORAGE PRESERVATION (Material No. 15-004) to the fastener bolt (4) holes.
 (3) Put the access panel (3) in position.
 CAUTION : YOU MUST REMOVE AND INSTALL THE BOLTS IN THE SPECIFIED_______ SEQUENCE. THIS WILL PREVENT DAMAGE TO THE ACCESS PANEL.
 