16. On the panel 121VU:
-Open, safety and tag this(these) circuit breaker(s): 8QA.
R R 17. On the panel 40VU:
-release (out) the R TK PUMPS 2 P/BSW.
1EFF : ALL 1 1 1CES On the ECAM lower DU:
-
the FUEL page shows the R TK PUMPS 1 symbol as an amber cross-line.
-
the R TK PUMPS 1 control circuits areenergized.
On the panel 40VU:
-
the R TK PUMPS 2 P/BSW FAULT light may come on momentarily and then go off
-
the R TK PUMPS 2 P/BSW OFF light goes off.
On the ECAM lower DU:
-
the R TK PUMPS 2 symbol changes from an amber cross-line to a green in-line.
On the panel 40VU:
-
the R TK PUMPS 2 P/BSW FAULT lightcomes on.
On the ECAM lower DU:
-
the FUEL page shows the right fuel pump LO (amber) caution.
On the ECAM upper DU:
-
the caution R TK PUMP 1 + 2 LO PRESS is shown.
On the panel 40VU:
-
the R TK PUMPS 2 P/BSW FAULT lightgoes off and the OFF light comes on.
1 28-21-00Page 507
1 May 01/0111
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------On the ECAM upper DU:
- the caution R TK PUMP 2 LO PRESS goes
off.
On the ECAM lower DU:
- the FUEL page shows the R TK PUMPS 2
symbol as an amber cross-line.
18. On the panel 121VU:
- Remove the safety clip(s) and - the R TK PUMPS 2 supply circuits are
the tag(s) and close energized.
this(these) circuit
breaker(s):
8QA.
5. Close-up________
Subtask 28-21-00-860-052
A. Aircraft Configuration
(1)
Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).
(2)
Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).
(3)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
Subtask 28-21-00-942-072
B. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the safety barriers.
(3)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 28-21-00Page 508 1 1 May 01/01R 1 1 1CES 1
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
TASK 28-21-00-720-001
Functional Test of the Center-Tank Fuel Control
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
To make sure that the center-tank fuel-feed system operates correctly in:
-manual control mode
-auto control mode.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice
No specific access platform 2.8 m (9 ft. 2 in.)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-00Page 509 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-004 24-41-00-861-002
24-41-00-862-002
27-80-00-866-004 27-80-00-866-005 28-25-00-650-001 28-25-00-869-001 31-60-00-860-001 31-60-00-860-002 32-12-00-010-001 32-12-00-410-001 57-41-37-000-006
57-41-37-400-006
73-25-34-000-040
73-25-34-400-040
73-25-34-710-040
3. Job Set-up
__________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(115)