(2)
Obey the fuel safety procedure (Ref. TASK 28-00-00-910-001).
1EFF : ALL 1 28-13-44Page 401 1 1 Feb 01/98 1 1 1CES 1 Subtask 28-13-44-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 28-13-44-010-050
C. Get Access
(1)
Remove the access panel 195CB on the left side of the belly fairing. (Ref. TASK 53-35-13-000-001)
(2)
Disconnect the electrical connector from the lower beacon/strobe light.
(3)
Put blanking caps on the disconnected electrical connectors.
4. Procedure
_________
(Ref. Fig. 401/TASK 28-13-44-991-001) Subtask 28-13-44-020-050
A. Removal of the Leak Monitor (500QM)
(1)
Drain the leak monitor (4) with a WATER DRAIN PURGER.
(2)
Disconnect the pipe (1) from the leak monitor (4). NOTE : Make sure that you do not cause damage to the pipe when you
____
move it from the leak monitor.
(3)
Remove the reducer union (2) from the leak monitor (4) and discard the O-ring (3).
(4)
Put blanking plugs on the disconnected line ends.
(5)
Remove the nuts (8), the washers (7) and the screws (6).
(6)
Remove the leak monitor (4) and discard the O-ring (5).
1EFF : ALL 1 28-13-44Page 402 1 1 Feb 01/98 1 1 1CES 1
Leak Monitor
Figure 401/TASK 28-13-44-991-001
1EFF : ALL 1 28-13-44 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 28-13-44-400-001
Installation of the Leak Monitor (500QM)
WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 04-006 USA MIL-G-6032 TYPE I GREASE, GASOLINE AND OIL RESISTANT (Ref. 20-31-00)
B. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
3 O-ring 28-13-03 04 -140 R 3 O-ring 28-13-03 04A-140 5 O-ring 28-13-03 04 -120 R 5 O-ring 28-13-03 04A-120
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
28-00-00-910-001 Fuel Safety Procedures
53-35-13-000-001 Removal of the Belly Fairing Access Panels
53-35-13-400-001 Installation of the Belly Fairing Access Panels
28-13-44-991-001 Fig. 401
1EFF : ALL 1 28-13-44Page 404 1 1 Feb 01/02 1 1 1CES 1
3. Job Set-up
__________ Subtask 28-13-44-865-052
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU LIGHTING/EXT LT/BEACON/LOWER 5LV U03
Subtask 28-13-44-860-050
B. Aircraft Maintenance Configuration
(1)
Make sure that the the access panel 195CB is removed (Ref. TASK 53-35-13-000-001).