 Do an inspection of the component interface and/or the adjacent area.


 1EFF : ALL 1 28-13-42Page 426 1 1 Aug 01/05 1 1 1CES 1


 (4) Apply SPECIAL MATERIALS (Material No. 05-043) to the edge of the RH vapor seal-membrane (46) where it joins the CTR vapor seal-membrane (35).
 NOTE : Put the vapor seal in position and attach it temporarily to
____ make the installation easier. Do not tighten all the screws, the studs and the nuts until all fittings are installed.
 (5) Install the RH Vapor Seal-Membrane
 (a) Install the sealing strips (75) and the lateral fittings (67), (68), (69), (70), (71) and (72) with the screws (6) and the washers (7) to the RH vapor seal-membrane (46).
 NOTE : Make sure that the clearance between the bonded sealing
____
 parts are filled with sealing compound.

 (b)
 If necessary apply SEALANTS (Material No. 09-001) to the
 clearance between the sealing parts.


 (c)
 Use SPECIAL MATERIALS (Material No. 05-043) where the vapor seal touches the sealing compound.

 (d)
 Install the sealing strips (75) and the longitudinal fittings (56), (57), (58), (59), (60), (61), (62), (63), (64), (65) and

 (66)
 with the studs (4), the washers (3) and the spring washers

 (8)
 to the RH vapor seal-membrane (46).

 (e)
 Install the sealing strips (75) and the attach frames (48), (49), (50), (51), (52), (53), (54) and (55) with the studs (4), the washers (3) and the spring washers (8) to the RH vapor seal-membrane (46).


 (6) Install the CTR Vapor Seal-Membrane
 (a)
 Apply SPECIAL MATERIALS (Material No. 05-043) to the edge of the CTR vapor seal-membrane (35) where it joins the LH vapor seal-membrane (1).

 (b)
 Install the sealing strips (75) and the lateral fittings (41), (42), (43), (44) and (45) with the screws (6) and the washers (7) to the CTR vapor seal-membrane (35).

 (c)
 Install the sealing strips (75), the attach frame (36) and the longitudinal fittings (37), (38), (39) and (40) with the studs (4), the washers (3) and the spring washers (8).


R 1EFF : 003-049, 051-099, 101-149, 151-199, 1 28-13-42Page 427 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1 (7) Install the LH Vapor Seal-Membrane


 (a) Install the sealing strips (75) and the lateral fittings (25), (26), (27), (28), (29) and (30) with the screws (6) and the washers (7) to the LH vapor seal-membrane (1).
 NOTE : Make sure that the clearance between the bonded sealing
____ parts are filled with sealing compound.
 (b)
 If necessary apply SEALANTS (Material No. 09-001) to the clearance between the sealing parts.

 (c)
 Use SPECIAL MATERIALS (Material No. 05-043) where the vapor seal touches the sealing compound.

 (d)
 Install the sealing strips (75) and the longitudinal fittings (31), (32), (33) and (34) to the joint of the CTR and the LH vapor seal with the studs (4), the washers (3) and the spring washers (8).

 (e)
 Install the sealing strips (75) and the longitudinal fittings (16), (17), (18), (19), (20), (21), (22), (23) and (24) with the studs (4), the washers (3) and the spring washers (8).

 (f)
 Install the sealing strips (75) and the attach frames (9), (10), (11), (12), (13), (14) and (15) with the studs (4), the washers

 (3)
 and the spring washers (8).
 NOTE : Make sure that the vapor seal-membranes have no scratches

 

____ or folds before you start to tighten the vapor seal.
 (8) TORQUE all the screws (6) and the studs (4) to 0.30 m.daN (26.54 lbf.in).
 **ON A/C ALL
 Subtask 28-13-42-790-050
 B. Leak Test
 (1) Do the leak test and make sure that the vapor seal does not leak (Ref. TASK 28-13-00-700-001).
 NOTE : If you find that the vapor seal membrane has a leak, do the
____ repair procedure (Ref. TASK 28-13-42-300-001).
R 1EFF : ALL 1 28-13-42Page 428 1 1 May 01/05 1 1 1CES 1


 If you find that there is a leak on the connections of the vapor seal membrane, repeat the applicable steps of the removal (Ref. TASK 28-13-42-000-001) and installation. Do the leak test (Ref. TASK 28-13-00-700-001) of the vapor seal again when the repair procedure is completed. ________
5. Close-up

R **ON A/C 001-049, 101-105, 151-199,
 Subtask 28-13-42-410-051-A
 A. Close Access (Ref. Fig. 401/TASK 28-13-42-991-004, 402/TASK 28-13-42-991-006)
 (1)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (2)
 Installation of the Heat Shields
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(48)