 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific safety barriers
 No specific access platform 3.0 m (9 ft. 10 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) Material No. 04-023 USA MIL-G-27617 GREASE-FUEL AND OXIDISER RESISTANT (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 Material No. 19-003  USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-42Page 405 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ------------------------------------ |IPC-CSN----------------------------------
2  O-rings  28-15-42 01 -020
 9  O-ring  28-15-05 01 -150
 10  O-rings  28-15-42 01 -030
 D. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003  Pressure Refuel with Automatic Control
 20-28-00-912-002  Electrical Bonding of Components With Conductive Bolts and Screws in the Tanks
 28-10-00-910-001 28-10-00-910-002  Safety Procedures When You Do Work in a Fuel TankAccess to the Fuel Tanks and the Work Areas
 28-15-00-740-002  Functional (BITE) Test of the Intercell Transfer Valves
 28-15-41-400-001 28-15-51-400-001 28-25-00-650-001  Installation of the Transfer Valve 27QM (29QM), 28QM (30QM)Installation of the Actuator 9QP(10QP)Pressure Defuel
 28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the Center Tank
 28-25-00-869-001  Fuel Transfer
 57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
 57-27-11-400-002  ....)Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
 28-15-42-991-001  ....)Fig. 401 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-42Page 406 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 28-15-42-941-057
 A. Safety Precautions
 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Make sure that the safety barriers are in position.


 Subtask 28-15-42-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/XFR VALVE1/WING/R 2QP A11 49VU FUEL/XFR VALVE1/WING/L 1QP A10 121VU FUEL/XFR VALVE2/WING/R 4QP M23 121VU FUEL/XFR VALVE2/WING/L 3QP M22
 Subtask 28-15-42-860-050
 C. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).

 (2)
 Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

 (3)
 Make sure that the access platform is below the applicable zone 540(640), 522(622).

 (4)
 Make sure that the applicable leading edge access panel 522KB(622KB) is removed.

 (5)
 Make sure that the applicable access panels are removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):

 -
FOR 70QM
 540JB and 540KB


 -
FOR 72QM

 


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-42Page 407 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 640JB and 640KB


 4. Procedure
_________
 (Ref. Fig. 401/TASK 28-15-42-991-001) Subtask 28-15-42-420-054
 A. Preparation for Installation
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
 