• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:49来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Center Tank 28-25-00-869-001 Fuel Transfer 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
 **ON A/C 001-001, 051-052,
 28-15-41-991-001  Fig. 401

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Post SB 28-1077 For A/C 001-001,051-052,
 28-15-41-991-001-A Fig. 401A FOR FIN 28QM, 30QM 20-28-00-912-002 Electrical Bonding of Components With Conductive
 Bolts and Screws in the Tanks
 20-28-00-912-043 Electrical Bonding by Direct Contact

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-41Page 408 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-15-41-991-001 FOR FIN 27QM, 29QM 20-28-00-912-002 28-15-41-991-001  Transfer ValveElectrical Bonding of Components With Conductive Bolts and Screws in the TanksTransfer Valve 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 3. Job Set-up__________
 **ON A/C 001-001, 051-052,
 (Ref. Fig. 401/TASK 28-15-41-991-001) 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Post SB  28-1077 For A/C 001-001,051-052,
 (Ref. Fig. 401A/TASK 28-15-41-991-001-A) 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 28-15-41-941-052
 A. Safety Precautions
 (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
 (2) Put the safety barriers in position. 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-41Page 409 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-15-41-865-051


 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/XFR VALVE1/WING/R 2QP A11 49VU FUEL/XFR VALVE1/WING/L 1QP A10 121VU FUEL/XFR VALVE2/WING/R 4QP M23 121VU FUEL/XFR VALVE2/WING/L 3QP M22
 Subtask 28-15-41-860-050
 C. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).

 (2)
 Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

 (3)
 Make sure that the access platform is below the applicable zone 540 (640).

 (4)
 Make sure that the applicable access panels are removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):

 -
FOR 27QM, 28QM
 access panels 540JB, 540KB


 -
FOR 29QM, 30QM
 access panels 640JB, 640KB.

 

 

 4. Procedure
_________
 **ON A/C 001-001, 051-052,
 (Ref. Fig. 401/TASK 28-15-41-991-001)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Post SB 28-1077 For A/C 001-001,051-052,
 (Ref. Fig. 401A/TASK 28-15-41-991-001-A)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-15-41Page 410 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,

 

 Subtask 28-15-41-420-052
 A. Preparation for Installation
 (1)
 Clean the component interfaces and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).

 (2)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (3)
 Clean the component interface and/or the adjacent area.

 (4)
 Apply FUELS (Material No. 01-001) or COMMON GREASE (Material No. 04-012) to the O-ring (3) and the O-ring (4).

 (5)
 Install the new O-ring(s) (3) and/or (4) into the transfer valve (5).

 (6)
 Turn the input shaft of the transfer valve (5), to align it with the transfer valve drive (6).


 **ON A/C 001-001, 051-052,
 Subtask 28-15-41-420-050
 B. Installation of the Transfer Valve
 (1)
 Push the transfer valve (5) into the transfer valve drive (6). Install the transfer valve (5) on RIB15 and hold it in position.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(65)