WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific non-metallic scraper
No specific safety barriers
No specific container 20 l (5.2833 USgal)
No specific access platform 4.0 m (13 ft. 1 in.)
No specific Torque Wrench : range 5.00 to 35.00 lbf.in
(0.05 to 0.40 m.daN)
No specific Torque Wrench : range 36.00 to 220.00 lbf.in
(0.40 to 2.60 m.daN)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) R Material No. 04-012 USA VV-P-236
PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) R Material No. 05-002 USA MIL-P-8116 R PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
Material No. 09-007 USA MIL-S-4383 BRUSHABLE FUEL RESISTANT COATING (Ref. 20-31-00)
1EFF : ALL 1 28-12-47Page 407 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004
Material No. 11-026 Material No. 15-004 Material No. 19-003
C. Expendable Parts
USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
GB DEF-STAN 68-148/1
SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-C-16173 GRADE 3
CORROSION PREVENTIVE COMPOUND (Ref. 20-31-00)
USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)
-------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ------------------------------------ |IPC-CSN----------------------------------
3 O-ring seal 28-12-05 34A-200
12 cable ties 28-12-05 34A-010
19 sealing ring 28-12-47 01 -010
D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control
20-28-00-912-002 Electrical Bonding of Components With Conductive Bolts and Screws in the Tanks
20-28-00-912-006 28-10-00-910-001 28-10-00-910-002 Electrical Bonding of PipesSafety Procedures When You Do Work in a Fuel TankAccess to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the Center Tank
28-25-00-869-001 Fuel Transfer
57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
....)
1EFF : ALL 1 28-12-47Page 408 1 1 May 01/04R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
57-27-11-400-002 Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
28-12-47-991-001 Fig. 401
**ON A/C 301-399,
28-12-47-991-001-A Fig. 401A R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
28-12-47-991-002 Fig. 402
**ON A/C 301-399,
28-12-47-991-002-A Fig. 402A
**ON A/C ALL
3. Job Set-up
__________
Subtask 28-12-47-941-051
A. Safety Precautions WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
(1)
You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
(2)
Make sure that the safety barriers are in position.
1EFF : ALL 1 28-12-47Page 409 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 28-12-47Page 410 1 1 Aug 01/05 1 1 1CES 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(34)