• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:49来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______
 NOTICES ARE IN POSITION.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific non-metallic scraper
 No specific safety barriers
 No specific container 20 l (5.2833 USgal)
 No specific access platform 4.0 m (13 ft. 1 in.)
 No specific Torque Wrench : range 5.00 to 35.00 lbf.in

 (0.05 to 0.40 m.daN)
 No specific Torque Wrench : range 36.00 to 220.00 lbf.in

 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) R Material No. 04-012 USA VV-P-236
 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) R Material No. 05-002 USA MIL-P-8116 R PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 Material No. 09-007  USA MIL-S-4383 BRUSHABLE FUEL RESISTANT COATING (Ref. 20-31-00)
 1EFF : ALL 1 28-12-47Page 407 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004
Material No. 11-026 Material No. 15-004 Material No. 19-003
C. Expendable Parts
USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)
GB DEF-STAN 68-148/1
 SOLVENT GENERAL PURPOSE (Ref. 20-31-00)
USA MIL-C-16173 GRADE 3
 CORROSION PREVENTIVE COMPOUND (Ref. 20-31-00)
USA AMS 3819
 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ------------------------------------ |IPC-CSN----------------------------------
3  O-ring seal  28-12-05 34A-200
 12  cable ties  28-12-05 34A-010
 19  sealing ring  28-12-47 01 -010
 D. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003  Pressure Refuel with Automatic Control
 20-28-00-912-002  Electrical Bonding of Components With Conductive Bolts and Screws in the Tanks
 20-28-00-912-006 28-10-00-910-001 28-10-00-910-002  Electrical Bonding of PipesSafety Procedures When You Do Work in a Fuel TankAccess to the Fuel Tanks and the Work Areas
 28-25-00-650-001  Pressure Defuel
 28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the Center Tank
 28-25-00-869-001  Fuel Transfer
 57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
 ....)

 1EFF : ALL 1 28-12-47Page 408 1 1 May 01/04R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 28-12-47-991-001  Fig. 401
 **ON A/C 301-399,
 28-12-47-991-001-A Fig. 401A R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 28-12-47-991-002  Fig. 402
 **ON A/C 301-399,
 28-12-47-991-002-A  Fig. 402A
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 28-12-47-941-051

 A. Safety Precautions WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Make sure that the safety barriers are in position.


 1EFF : ALL 1 28-12-47Page 409 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 28-12-47Page 410 1 1 Aug 01/05 1 1 1CES 1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(34)