ACTION RESULT -------------------------------------------------------------------------------
4. On the panel 40VU:
-push (in) the R TK PUMPS 1 and 2 P/BSW.
5. Close-up
________ Subtask 28-21-00-860-062-A
 A. Aircraft ConfigurationOn the panel 40VU:
-the R TK PUMPS 1 and 2 P/BSW FAULTlight comes on momentarily and then goes off
 -when the FAULT light goes off, the R TK PUMPS 1 and 2 P/BSW OFF lights goes off.
 On the ECAM lower DU:
 -
the right tank pump 1 and 2 (amber cross-line) cautions go off

 -
the pump symbols show green in-line.


 (1)
 Stop the engines (Ref. TASK 71-00-00-710-027) or (Ref. TASK 71-00-00-710-028).

 (2)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 Subtask 28-21-00-942-074
 B. Removal of Equipment
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the safety barriers.

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 28-21-00Page 542 1 1 May 01/04R 1 1 1CES 1


 TASK 28-21-00-790-001
 Leak Test of the Main Fuel-Pump-System Pipelines
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 To leak test the pipes installed or replaced in the fuel-pump system
 pipelines.

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
 1EFF : ALL 1 28-21-00Page 543 1 1 May 01/04R 1 1 1CES 1


 3. Job Set-up
__________ Subtask 28-21-00-941-070
 A. Safety Precautions
 (1) Put the safety barriers in position. Subtask 28-21-00-860-076
 B. Aircraft Maintenance Configuration WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED
_______ BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001), then:


 - on the ECAM control panel (CP), push (in) the FUEL push icon switch
 -make sure that the FUEL page shows on the ECAM lower Display Unit (DU).
 (3)
 Make sure that the opposite wing tank contains sufficient fuel for the test. If necessary refuel (Ref. TASK 12-11-28-650-003).

 (4)
 On the panel 40VU:


 -push (in) the X-FEED P/BSW.
 4. Procedure
_________
 NOTE : The wing-tank fuel-pump suction valves have a controlled fuel leak

____ rate when in the closed position. The fuel flow (controlled leak) is to prevent the formation of ice in the mouth of the suction valve. The fuel flow is only from the center tank to the wing tank. The maximum permitted flow is 210 kg (463 lb/Hour).
 1EFF : ALL 1 28-21-00Page 544 1 1 May 01/04R 1 1 1CES 1


 Subtask 28-21-00-790-050
 A. Leak Test of the Main Fuel-Pump-System Pipelines (Left Wing, Fuselage and Center Tank)
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the panel 40VU:  On the panel 40VU:
 - push (in) the R TK PUMP 1 and  - the R TK PUMP 1 and PUMP 2 P/BSW OFF
 PUMP 2 P/BSWs.  lights go off
 