• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:49来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 4. Procedure
_________ (Ref. Fig. 402/TASK 28-12-43-991-002) Subtask 28-12-43-020-052
 A. Removal of the Vent Float-Valve 16QM(17QM)
 (1)
 Remove the bolt (3), the washer (4) and disconnect the end of the bonding strap (5).

 (2)
 Remove the bolts (6) and the nuts (2).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-43Page 411 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Vent Float - Valve 16QM (17QM)
 Figure 402/TASK 28-12-43-991-002

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-43Page 412 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (3)
 Remove the vent float-valve (1) and discard the O-ring (8).

 (4)
 Install the blanking cap in the open end of the adaptor (7).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-43Page 413 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-12-43-400-002


 Installation of the Vent Float-Valve 16QM (17QM)
 WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
_______ NOTICES ARE IN POSITION.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific safety barriers
 No specific access platform 2.5 m (8 ft. 2 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 01-001 USA ASTM-D-1655-93 (JET A-1) FUEL, TURBO (Ref. 20-31-00) Material No. 04-012 USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00) Material No. 09-007 USA MIL-S-4383 BRUSHABLE FUEL RESISTANT COATING (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 Material No. 19-003  USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-43Page 414 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
8  O-ring  28-12-05 31A-220
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 20-28-00-912-002 Electrical Bonding of Components With Conductive
 Bolts and Screws in the Tanks 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-25-00-650-001 Pressure Defuel 28-25-00-869-001 Fuel Transfer 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
 57-27-11-400-002  Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
 28-12-43-991-002  Fig. 402
 3. Job Set-up
__________
 Subtask 28-12-43-941-058
 A. Safety Precautions
 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1)
 You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.

 (2)
 Make sure that the safety barriers are in position.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-43Page 415 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-12-43-860-054


 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).

 (2)
 Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (3)
 Make sure that the access platform is below the applicable zone 540(640).

 (4)
 Make sure that the applicable access panels are removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油2(11)