3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the BMC1 and BMC2 (Ref. AMM TASK 36-11-00-740-001).
4. Fault Isolation
_______________
A. If the test gives these two maintenance messages:
- on the BMC1:
L WING LOOP A INOP
-and on the BMC2:
BMC2
-replace the BMC-2 (1HA2) (Ref. AMM TASK 36-11-34-000-001) and (Ref. AMM TASK 36-11-34-400-001).
(1) Do this trouble shooting procedure (Ref. TASK 36-22-00-810-807).
1
-EFF : ALL
-∞∞36-22-00∞∞∞∞∞∞∞∞∞∞Page 236
--Feb 01/03R ---CES -
Loss of the Right-Wing Leak Detection
1. Possible Causes
_______________
-BMC-2 (1HA2)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-22-00-810-806 Loss of the Leak Detection Loop A on the Right Wing
AMM 36-11-00-740-001 BITE Test of the BMC 1(2)
AMM 36-11-34-000-001 Removal of the BMC (1HA1, 1HA2)
AMM 36-11-34-400-001 Installation of the BMC (1HA1, 1HA2)
3. Fault Confirmation
__________________
A. Test
(1) Do the operational test of the BMC1 and BMC2 (with the CFDS) (Ref. AMM TASK 36-11-00-740-001).
4. Fault Isolation
_______________
A. If the test gives these two maintenance messages on the BMC1 : R WING LOOP A INOP and on the BMC2 : BMC2:
-replace the BMC-2 (1HA2) (Ref. AMM TASK 36-11-34-000-001) and (Ref. AMM TASK 36-11-34-400-001).
(1) Do this trouble shooting procedure (Ref. TASK 36-22-00-810-806).
1
-EFF : ALL
-∞∞36-22-00∞∞∞∞∞∞∞∞∞∞Page 237
--Feb 01/03R ---CES -
Inadvertent Leak Detection by the left wing loops
1.
Possible Causes
_______________
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-22-00-810-825 Leak Detection from the Loop A in the Left Wing 36-22-00-810-826 Leak Detection from the Loop B in the Left Wing
3. Fault Confirmation
__________________
A. Test
Not applicable
4. Fault Isolation
_______________
A. Do the following procedures: (Ref. TASK 36-22-00-810-825) and (Ref. TASK 36-22-00-810-826)
1
-EFF : ALL
-∞∞36-22-00∞∞∞∞∞∞∞∞∞∞Page 238
--Feb 01/03R ---CES -
Inadvertent Leak Detection by the right wing loops
1.
Possible Causes
_______________
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
36-22-00-810-827 Leak Detection from the Loop A in the Right Wing 36-22-00-810-828 Leak Detection from the Loop B on the Right Wing
3. Fault Confirmation
__________________
A. Test
Not applicable
4. Fault Isolation
_______________
A. Do the following procedures: (Ref. TASK 36-22-00-810-827) and (Ref. TASK 36-22-00-810-828)
1
-EFF : ALL
-∞∞36-22-00∞∞∞∞∞∞∞∞∞∞Page 239
--Feb 01/03R ---CES -
Unwanted Engine 1 Leak Detection
1. Possible Causes
_______________
-BMC-1 (1HA1)