(2)
Do a general visual inspection of the pressure bulkhead AFT face at FR35 and the lower skin of the pressure deck lower surface between FR35 and FR36 for corrosion and other damage.
(3)
If necessary, refer to the ASRM (Ref. ASRM 53-31-16-001) and (Ref. ASRM 53-31-14-001) for the correct repair procedures.
CAUTION : DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS.
_______ MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET: -ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS. -ON LUBRICATED SURFACES. -IN DRAIN VALVES OR OTHER ORIFICES. TEMPORARY PROTECTION ON OR IN THESE PARTS CAN CAUSE DAMAGE.
Inspection Areas of the Aft Face of the Pressure Bulkhead and the Bottom
Surface of the Pressure Deck
Figure 632/TASK 53-31-00-991-043
EFF : ALL 53-31-00Page A670 May 01/04 R CES
(4) Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE
PRESERVATION (Material No. 15-005A) or STORAGE PRESERVATION (Material
No. 15-006) or equivalent to the pressure bulkhead AFT face at FR35
and the lower skin of the pressure deck lower surface between FR35
and FR36.
R **ON A/C 301-399,
R Subtask 53-31-00-210-081-A
R A. General Visual Inspection
R WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE_______
R MATERIAL/S.
R USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
R WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK_______
R AREA WHEN YOU USE SPECIAL MATERIALS.
R IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH
R OR IN YOUR EYES :
R -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
R MINUTES.
R -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
R DO NOT BREATHE THE FUMES FROM THE MATERIAL.
R DO NOT SMOKE WHEN YOU USE THE MATERIAL.
R DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF
R HEAT.
R THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE
R AND SKIN IRRITANTS.
R (1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004)
R and a lint free cloth. Make sure that the area is dry before you
R continue.
R (2) Do a general visual inspection of the pressure bulkhead AFT face at
R FR35 and the lower skin of the pressure deck lower surface between
R FR35.8 and FR36 for corrosion and other damage.
EFF : ALL 53-31-00Page A671 May 01/04
CES CES
R R (3) If necessary, refer to the ASRM (Ref. ASRM 53-31-16-001) and (Ref. ASRM 53-31-14-001) for the correct repair procedures.
R R R R R R R CAUTION : DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS._______ MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET: -ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS. -ON LUBRICATED SURFACES. -IN DRAIN VALVES OR OTHER ORIFICES. TEMPORARY PROTECTION ON OR IN THESE PARTS CAN CAUSE DAMAGE.
R R R R R (4) Apply STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-005A) or STORAGE PRESERVATION (Material No. 15-006) or equivalent to the pressure bulkhead AFT face at FR35 and the lower skin of the pressure deck lower surface between FR35.8 and FR36.
R **ON A/C ALL
5. Close-up________
Subtask 53-31-00-410-091
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Install the quick-release access panels (Ref. TASK 53-35-13-400-002): - 191BB and 191EB on the left side, - 192EB and 192FB on the right side.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(85)