|-------------|----------------------------------|----------------------------| 
 | Panel FIN | Belly Fairing Missing Fasteners | | 
 | | Description | | 
 |-------------|----------------------------------|----------------------------|  
R  | | are installed on all corner | |  
R  | | areas of each panel (count from| |  
R  | | the corner). | |  
R  | | | |  
R  | | At panels with sealing profiles: | |  
R  | | One fastener at every fourth | |  
R  | | fastener position is permitted | |  
R  | | missing, only if in accordance | |  
R  | | with the subsequent condition: | |  
R  | | - that a minimum of four | |  
R  | | fasteners of the first fastener| |  
R  | | positions are installed on all | |  
R  | | corner areas of each panel | |  
R  | | (count from the corner). | |  
R  |-------------|----------------------------------|----------------------------|  
R  | 191BT/192BT | (Ref. Fig. 603/TASK 53-35-00-991-| Replace the missing |  
R  | 191CT/192CT | 006-001) | fasteners before 10 flight |  
R  | | 1 - Missing fasteners are not | cycles |  
R  | | permitted in the corner areas| |  
R  | | 2 - Three missing fasteners are | |  
R  | | permitted when two fasteners | |  
R  | | are installed at each side of| |  
R  | | an empty hole. | |  
R  | | 3 - One missing fastener is | |  
R  | | permitted. | |  
R  | | 4 - Two missing fasteners are | |  
R  | | permitted when they are not | |  
R  | | adjacent to each other. | |  
R  |-------------|----------------------------------|----------------------------| 
 **ON A/C ALL 
 5. Close-up________ 
 Subtask 53-35-00-410-051 
 A. Close Access 
 (1) Remove the ground support and maintenance equipment, the special and 
 standard tools and all other items. 
 (2) Remove the access platform(s).
 EFF : ALL 
53-35-00Page 617 
May 01/04
 (3) Make sure that the work area is clean and clear of tool(s) and other
items.
 EFF : ALL 
53-35-00Page 618
R TASK 53-35-00-220-001
R  Inspection of the Vanes of the Belly-Fairing Louver-Panels  
R  1. Reason for the Job__________________  
R  Refer to the CDL TASK: TBD  
R  2. Job Set-up Information______________________  
R  A. Fixtures, Tools, Test and Support Equipment  
R  ------------------------------------------------------------------------------- 
R  REFERENCE  QTY DESIGNATION  
R  ------------------------------------------------------------------------------- 
R  No specific  1 ACCESS PLATFORM 1M (3 FT)  
R  B. Referenced Information  
R  ------------------------------------------------------------------------------- 
R  REFERENCE  DESIGNATION  
R  -------------------------------------------------------------------------------
R  29-10-00-864-001  Depressurize the Green Hydraulic System  
R  29-10-00-864-002  Depressurize the Yellow Hydraulic System  
R  29-10-00-864-003  Depressurize the Blue Hydraulic System  
R  32-12-00-010-001  Open the Main Gear Doors for Access  
R  32-12-00-410-001  Close the Main Gear Doors after Access  
R  CDL 53-01  
R  53-35-13-000-004  Removal of the Louver Panel - Panel 147FB (148FB)  
R  (for corrective action)  
R  3. Job Set-up__________  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(107)