(3)
On the panel 198DB connect the cord.
(4)
Put the panel (4) in position.
EFF : ALL
53-35-13Page 445
R (5) Tighten the studs (3).
R R NOTE : When you tighten the studs, do not TORQUE to more than 0.3____ m.daN (26.5486 lbf.in).
R **ON A/C ALL
5. Close-up________
Subtask 53-35-13-410-053
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Remove the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) from the flap/slat control lever.
(3) Remove the warning notice(s).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
EFF : ALL
53-35-13Page 446
R TASK 53-35-13-000-004
R Removal of the Louver Panel - Panel 147FB (148FB)
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______
R START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R 1. Reason for the Job__________________
R Self Explanatory
R 2. Job Set-up Information______________________
R A. Fixtures, Tools, Test and Support Equipment
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R No specific 1 ACCESS PLATFORM 1M (3 FT)
R B. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 29-10-00-864-001 Depressurize the Green Hydraulic System
R 29-10-00-864-002 Depressurize the Yellow Hydraulic System
R 29-10-00-864-003 Depressurize the Blue Hydraulic System
R 32-12-00-010-001 Open the Main Gear Doors for Access
R 53-35-13-991-011 Fig. 408
R 3. Job Set-up__________
R Subtask 53-35-13-010-055
R A. Get Access
R (1) Open the MLG doors (Ref. TASK 32-12-00-010-001). R (2) Put the ACCESS PLATFORM 1M (3 FT) in position.
EFF : ALL
53-35-13Page 447
Nov 01/04
R Subtask 53-35-13-860-054
R B. Aircraft Maintenance Configuration
R (1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
R 29-10-00-864-001), (Ref. TASK 29-10-00-864-002) and (Ref. TASK 29-10-
R 00-864-003).
R 4. Procedure_________
R (Ref. Fig. 408/TASK 53-35-13-991-011)
R Subtask 53-35-13-020-056
R A. Removal of the Louver Panel
R (1) Remove the nuts (1), the washers (2) and the screws (3) from the
R louver panel (4).
R (2) Remove the louver panel (4).
EFF : ALL
53-35-13Page 448
Nov 01/04
R R Louver Panel - Panel 147FB (148FB) - Location and Detail Figure 408/TASK 53-35-13-991-011
EFF : ALL 53-35-13 Page 449 Nov 01/04
CES
R TASK 53-35-13-400-004
R Installation of the Louver Panel - Panel 147FB (148FB)
R WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______
R START A TASK ON OR NEAR:
R - THE FLIGHT CONTROLS
R - THE FLIGHT CONTROL SURFACES
R - THE LANDING GEAR AND THE RELATED DOORS
R - COMPONENTS THAT MOVE.
R 1. Reason for the Job__________________
R Self Explanatory
R 2. Job Set-up Information______________________
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(129)