R EFF : 001-049, 051-099, 101-105, 151-156, 53-31-00Page A601 201-208, May 01/05
CES
Subtask 53-31-00-110-077
B. Cleaning Procedure
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE
_______ MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
_______ AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
(1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint free cloth , if necessary. Make sure the area is dry before you continue.
4. Procedure
_________
Subtask 53-31-00-210-075
A. Detailed Visual Inspection Procedure
(Ref. Fig. 622/TASK 53-31-00-991-031)
(1) Do a detailed visual inspection of the riveted area of the keel beam side panel at the attachment to the center wing box, LH and RH, for cracks.
NOTE : If required, for information on repair procedures for cracks,
____ refer to the ASRM miscellaneous structure (Ref. ASRM 53-31-29-201).
R EFF : 001-049, 051-099, 101-105, 151-156, 53-31-00Page A602 201-208, May 01/05
CES
Riveted Area of Keel Beam Side Panel at Attachment to Center Wing Box, LH/RH Figure 622/TASK 53-31-00-991-031
R EFF : 001-049, 051-099, 101-105, 151-156, 53-31-00Page A603 201-208, May 01/05
CES 5. Close-up
________
Subtask 53-31-00-410-083
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
R (2) Install the access panels 191KB, 192KB, 195AB and 196AB (Ref. TASK 53-35-13-400-002).
(3)
Close the access doors 195BB and 196BB.
(4)
Remove the access platform(s).
(5)
Close the MLG doors (Ref. TASK 32-12-00-410-001).
(6)
Remove the warning notice(s).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R EFF : 001-049, 051-099, 101-105, 151-156, 53-31-00Page A604 201-208, May 01/05
CES **ON A/C ALL
TASK 53-31-00-210-027
Detailed Visual Inspection of Lower Skin of Longitudinal Lap Joint at Stringer 18 LH and Stringer 18 RH, in Runout Area at FR42, Internal
1. Reason for the Job
__________________
Refer to the MPD TASK: 533138-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint free cloth
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 25-23-43-000-001 Removal of the Upper Sidewall Panel(s) 25-23-43-400-001 Installation of the Upper Sidewall Panel(s) 25-80-00-000-001 Removal of the Insulation Blankets 25-80-00-400-001 Installation of the Insulation Blankets ASRM 53-00-11-201 (for corrective action)
EFF : ALL 53-31-00Page A605
May 01/04
R
CES
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
ASRM 53-00-13-201 (for corrective action) ASRM 53-31-11-101 (for corrective action) 53-31-00-991-029 Fig. 623
3. Job Set-up
__________
Subtask 53-31-00-861-055
A. Energize the ground service network
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(68)